GTR at Leagrave
How this operator is doing here
GTR had 53,504 scheduled stops at Leagrave in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 85.5% of recorded arrivals came within three minutes and 6.1% of stops were cancelled.
GTR trains at Leagrave also serve Luton (4.0 km south-east, 82.8% on time, 5.1% cancelled), Luton Airport Parkway (5.6 km south-east, 79.5% on time, 5.1% cancelled), Harlington (Bedfordshire) (6.7 km north, 84.6% on time, 6.1% cancelled), Flitwick (11.2 km north, 83.8% on time, 6.0% cancelled), Harpenden (12.5 km south-east, 80.1% on time, 5.7% cancelled) and Hitchin (14.5 km east, 77.3% on time, 6.9% cancelled), which are the stations on its network closest to Leagrave.
Within 30 km of here, GTR runs best at Watton-At-Stone, 23.9 km east (90.4%), and worst at Radlett, 26.3 km south (72.1%).
The busiest GTR station within 30 km of Leagrave is St Albans City, 19.4 km south-east, with about 329 scheduled stops a day.
Of the 1 operators with enough records at Leagrave, GTR is the most punctual, at 85.5%.
For GTR, Leagrave is the 120th best of 307 ranked stations. Its 85.5% here is 2.6 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Leagrave are near its usual level: 6.1% of scheduled stops, against 4.7% across its network and 6.1% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,295 | 83.9% | 4.2% |
| Period 6 of 2026-27 | 4,182 | 80.8% | 7.2% |
| Period 5 of 2026-27 | 4,136 | 79.7% | 9.5% |
| Period 4 of 2026-27 | 4,105 | 80.9% | 8.5% |
| Period 3 of 2026-27 | 2,958 | 87.1% | 4.6% |
| Period 2 of 2026-27 | 3,768 | 89.0% | 3.8% |
| Period 1 of 2026-27 | 4,563 | 90.4% | 3.8% |
| Period 13 of 2025-26 | 4,676 | 87.6% | 3.8% |
| Period 12 of 2025-26 | 4,308 | 88.7% | 7.0% |
| Period 11 of 2025-26 | 4,255 | 86.8% | 5.9% |
| Period 10 of 2025-26 | 3,818 | 87.9% | 6.2% |
| Period 9 of 2025-26 | 4,246 | 81.6% | 10.1% |
| Period 8 of 2025-26 | 4,194 | 86.1% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out