West Midlands Railway at Langley Green
All trains at Langley GreenWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 22,335 scheduled stops at Langley Green in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 89.0% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
West Midlands Railway trains at Langley Green also serve Sandwell and Dudley (1.7 km north, 75.3% on time, 2.8% cancelled), Smethwick Galton Bridge (1.9 km north-east, 80.1% on time, 3.6% cancelled), Smethwick Rolfe Street (2.4 km east, 79.2% on time, 2.7% cancelled), Rowley Regis (2.5 km south-west, 88.2% on time, 3.5% cancelled), The Hawthorns (3.1 km north-east, 87.5% on time, 3.5% cancelled) and Old Hill (4.2 km south-west, 88.9% on time, 3.7% cancelled), which are the stations on its network closest to Langley Green.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 10.2 km south-west (100.0%), and worst at Tamworth, 26.8 km north-east (43.1%).
The busiest West Midlands Railway station within 30 km of Langley Green is Birmingham New Street, 7.4 km east, with about 532 scheduled stops a day.
Of the 1 operators with enough records at Langley Green, West Midlands Railway is the most punctual, at 89.0%.
Over three full railway years West Midlands Railway at Langley Green has improved each time, from 85.5% within three minutes in 2023-24 to 89.8% in 2024-25 and 89.9% in 2025-26.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,772 | 87.7% | 2.1% |
| Period 6 of 2026-27 | 1,772 | 87.6% | 1.4% |
| Period 5 of 2026-27 | 1,292 | 86.7% | 6.7% |
| Period 4 of 2026-27 | 1,633 | 86.0% | 4.7% |
| Period 3 of 2026-27 | 1,680 | 89.6% | 3.6% |
| Period 2 of 2026-27 | 1,633 | 88.4% | 4.0% |
| Period 1 of 2026-27 | 2,055 | 91.8% | 3.4% |
| Period 13 of 2025-26 | 1,932 | 91.3% | 3.5% |
| Period 12 of 2025-26 | 1,772 | 92.8% | 2.5% |
| Period 11 of 2025-26 | 1,706 | 92.5% | 2.9% |
| Period 10 of 2025-26 | 1,547 | 89.0% | 4.8% |
| Period 9 of 2025-26 | 1,771 | 84.8% | 3.8% |
| Period 8 of 2025-26 | 1,770 | 87.1% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Langley Green
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 256 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out