Northern at Lancaster
How this operator is doing here
Northern had 34,965 scheduled stops at Lancaster in the 13 periods to Period 7 of 2026-27, 52% of the station's total. 71.9% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Northern trains at Lancaster also serve Bare Lane (3.4 km north-west, 86.2% on time, 3.9% cancelled), Morecambe (4.6 km north-west, 84.9% on time, 3.9% cancelled), Heysham Port (7.1 km west, – on time, – cancelled), Carnforth (9.3 km north, 76.4% on time, 2.6% cancelled), Silverdale (13.4 km north, 68.2% on time, 3.4% cancelled) and Kents Bank (15.8 km north-west, 71.2% on time, 3.4% cancelled), which are the stations on its network closest to Lancaster.
Within 30 km of here, Northern runs best at Bare Lane, 3.4 km north-west (86.2%), and worst at Arnside, 17.2 km north (67.8%).
The busiest Northern station within 30 km of Lancaster is Blackpool North, 29.6 km south-west, with about 134 scheduled stops a day.
Of the 3 operators with enough records at Lancaster, Northern is the most punctual, at 71.9%.
For Northern, Lancaster is the 412th best of 493 ranked stations. Its 71.9% here is 6.7 percentage points below the 78.6% across the whole network.
Over three full railway years Northern at Lancaster has got worse each time, from 74.1% within three minutes in 2023-24 to 73.9% in 2024-25 and 72.0% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,692 | 71.2% | 2.6% |
| Period 6 of 2026-27 | 2,684 | 71.3% | 1.6% |
| Period 5 of 2026-27 | 2,692 | 68.6% | 3.6% |
| Period 4 of 2026-27 | 2,688 | 67.7% | 2.1% |
| Period 3 of 2026-27 | 2,682 | 69.3% | 2.8% |
| Period 2 of 2026-27 | 2,692 | 72.6% | 2.9% |
| Period 1 of 2026-27 | 2,935 | 77.9% | 1.7% |
| Period 13 of 2025-26 | 2,935 | 75.2% | 3.6% |
| Period 12 of 2025-26 | 2,676 | 72.9% | 2.4% |
| Period 11 of 2025-26 | 2,655 | 81.6% | 1.4% |
| Period 10 of 2025-26 | 2,251 | 72.6% | 6.4% |
| Period 9 of 2025-26 | 2,692 | 65.5% | 4.3% |
| Period 8 of 2025-26 | 2,691 | 67.2% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lancaster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 18,466 | 42.1% | 4.6% |
| TransPennine Express | 13,888 | 52.7% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out