Avanti at Lancaster
How this operator is doing here
Avanti had 18,466 scheduled stops at Lancaster in the 13 periods to Period 7 of 2026-27, 27% of the station's total. 42.1% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.
Avanti trains at Lancaster also serve Poulton-le-Fylde (25.3 km south-west, – on time, – cancelled), Oxenholme Lake District (29.1 km north, 38.5% on time, 4.8% cancelled), Kirkham and Wesham (29.5 km south, – on time, – cancelled), Blackpool North (29.6 km south-west, 79.7% on time, 10.5% cancelled), Preston (Lancs) (33.2 km south, 52.1% on time, 4.0% cancelled) and Hellifield (38.2 km east, – on time, – cancelled), which are the stations on its network closest to Lancaster.
The busiest Avanti station within 30 km of Lancaster is Oxenholme Lake District, 29.1 km north, with about 36 scheduled stops a day.
Of the 3 operators with enough records at Lancaster, Avanti is the least punctual, at 42.1%.
Avanti at Lancaster has slipped a little, from 45.0% within three minutes in the previous 13 periods to 42.1% in the latest 13, a fall of 2.9 percentage points. Cancellations rose to 4.6% of scheduled stops from 3.9%, which is 0.7 percentage points more.
Over three full railway years Avanti at Lancaster has got worse each time, from 48.8% within three minutes in 2023-24 to 47.7% in 2024-25 and 43.5% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,540 | 42.7% | 2.5% |
| Period 6 of 2026-27 | 1,529 | 40.8% | 1.0% |
| Period 5 of 2026-27 | 1,539 | 39.6% | 6.2% |
| Period 4 of 2026-27 | 1,541 | 33.4% | 9.9% |
| Period 3 of 2026-27 | 1,497 | 44.1% | 3.5% |
| Period 2 of 2026-27 | 1,461 | 45.7% | 3.3% |
| Period 1 of 2026-27 | 1,117 | 48.8% | 1.2% |
| Period 13 of 2025-26 | 1,679 | 50.2% | 4.5% |
| Period 12 of 2025-26 | 1,528 | 46.8% | 3.0% |
| Period 11 of 2025-26 | 923 | 52.9% | 2.6% |
| Period 10 of 2025-26 | 1,143 | 36.5% | 5.9% |
| Period 9 of 2025-26 | 1,524 | 28.6% | 8.8% |
| Period 8 of 2025-26 | 1,445 | 39.3% | 6.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lancaster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 34,965 | 71.9% | 2.9% |
| TransPennine Express | 13,888 | 52.7% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out