Kirkby-in-Furness
KBFNorth WestManaged by Northern Trains
How this station is performing
Kirkby-in-Furness has usable figures for 10 of the last 13 four-week periods to Period 7 of 2026-27, covering 8,638 scheduled stops, about 24 a day. In those periods 79.8% of stops arrived within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Kirkby-in-Furness opened on 24 August 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kirkby-in-Furness is the oldest; the next oldest, Green Road, dates from 1850.
The nearest stations to Kirkby-in-Furness are Foxfield (3.4 km north-west), Green Road (4.0 km west), Askam (5.0 km south), Millom (6.0 km south-west) and Ulverston (7.4 km south-east). 7 stations lie within 10 km in all. Of the five, Askam is the most punctual at 81.7% and Ulverston the least at 73.8%, with Kirkby-in-Furness on 79.8%.
Kirkby-in-Furness takes its name from a Village called Kirkby-in-Furness, home to about 580 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Kirkby-in-Furness was Period 9 of 2023-24, at 64.3%, some time before the latest year. The strongest was Period 5 of 2025-26, at 86.4%, and the two are 22.1 percentage points apart. Cancellations peaked at 16.5% of scheduled stops in Period 9 of 2023-24, against 4.9% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Kirkby-in-Furness is the least punctual, at 79.8%. All of them are ahead, including Green Road (79.9%), Foxfield (80.1%) and Orrell (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 8,638 | 79.8% | 4.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 660 | – | 3.2% |
| Period 6 of 2026-27 | 660 | 84.3% | 5.8% |
| Period 5 of 2026-27 | 660 | 80.4% | 3.5% |
| Period 4 of 2026-27 | 660 | – | 4.5% |
| Period 3 of 2026-27 | 660 | 82.5% | 4.1% |
| Period 2 of 2026-27 | 660 | 78.8% | 2.0% |
| Period 1 of 2026-27 | 757 | – | 0.8% |
| Period 13 of 2025-26 | 726 | 85.3% | 4.4% |
| Period 12 of 2025-26 | 661 | 78.5% | 4.2% |
| Period 11 of 2025-26 | 659 | 84.2% | 5.3% |
| Period 10 of 2025-26 | 555 | 80.3% | 14.2% |
| Period 9 of 2025-26 | 660 | 75.9% | 7.1% |
| Period 8 of 2025-26 | 660 | 69.7% | 6.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Green Road | 8,638 | 79.9% | 4.9% |
| Foxfield | 8,691 | 80.1% | 4.9% |
| Orrell | 8,740 | 86.9% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out