Green Road
GNRNorth WestManaged by Northern Trains
How this station is performing
Green Road has usable figures for 10 of the last 13 four-week periods to Period 7 of 2026-27, covering 8,638 scheduled stops, about 24 a day. In those periods 79.9% of stops arrived within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Green Road opened on 1 December 1850, 176 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kirkby-in-Furness is the oldest (1846) and Foxfield the newest (1858), with Green Road in between.
The nearest stations to Green Road are Foxfield (2.5 km north-east), Kirkby-in-Furness (4.0 km east), Millom (4.1 km south-west), Silecroft (6.1 km west) and Askam (6.7 km south-east). 5 stations lie within 10 km in all. Of the five, Askam is the most punctual at 81.7% and Silecroft the least at 74.0%, with Green Road on 79.9%.
For Green Road, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 71.6% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 87.0%, which is 15.4 percentage points higher. Cancellations peaked at 16.5% of scheduled stops in Period 9 of 2023-24, against 4.9% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Green Road on 79.9%. The comparison group includes Kirkby-in-Furness (79.8%), Foxfield (80.1%) and Orrell (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 8,638 | 79.9% | 4.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 660 | – | 3.2% |
| Period 6 of 2026-27 | 660 | 84.6% | 5.8% |
| Period 5 of 2026-27 | 660 | 82.1% | 3.5% |
| Period 4 of 2026-27 | 660 | – | 4.5% |
| Period 3 of 2026-27 | 660 | 81.7% | 4.1% |
| Period 2 of 2026-27 | 660 | 79.9% | 2.0% |
| Period 1 of 2026-27 | 757 | – | 0.8% |
| Period 13 of 2025-26 | 726 | 83.6% | 4.4% |
| Period 12 of 2025-26 | 661 | 78.2% | 4.2% |
| Period 11 of 2025-26 | 659 | 83.0% | 5.3% |
| Period 10 of 2025-26 | 555 | 80.3% | 14.2% |
| Period 9 of 2025-26 | 660 | 75.9% | 7.1% |
| Period 8 of 2025-26 | 660 | 71.6% | 6.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kirkby-in-Furness | 8,638 | 79.8% | 4.9% |
| Foxfield | 8,691 | 80.1% | 4.9% |
| Orrell | 8,740 | 86.9% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out