GTR had 17,260 scheduled stops at Kings Lynn in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 65.1% of recorded arrivals came within three minutes and 9.8% of stops were cancelled.
GTR trains at Kings Lynn also serve Watlington (9.2 km south, 62.7% on time, 10.0% cancelled), Downham Market (16.9 km south, 64.2% on time, 10.0% cancelled), Littleport (33.0 km south, 65.2% on time, 9.9% cancelled), Ely (41.4 km south, 66.9% on time, 10.7% cancelled), Peterborough (48.4 km south-west, 79.8% on time, 4.5% cancelled) and Waterbeach (56.4 km south, 68.1% on time, 10.5% cancelled), which are the stations on its network closest to Kings Lynn.
The busiest GTR station within 30 km of Kings Lynn is Downham Market, 16.9 km south, with about 47 scheduled stops a day.
Of the 1 operators with enough records at Kings Lynn, GTR is the most punctual, at 65.1%.
GTR at Kings Lynn has slipped sharply. 65.1% of stops came within three minutes of the timetable in the latest 13 periods, 11.4 percentage points worse than the 76.5% recorded in the 13 before. Cancellations rose to 9.8% of scheduled stops from 6.7%, which is 3.1 percentage points more.
GTR at Kings Lynn has not moved in one direction over three full railway years: 81.9% within three minutes in 2023-24, 85.6% in 2024-25 and 69.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,254 | 56.1% | 7.8% |
| Period 6 of 2026-27 | 1,413 | 62.9% | 24.2% |
| Period 5 of 2026-27 | 1,343 | 65.8% | 13.8% |
| Period 4 of 2026-27 | 1,392 | 51.9% | 17.0% |
| Period 3 of 2026-27 | 1,366 | 66.2% | 9.0% |
| Period 2 of 2026-27 | 1,176 | 59.9% | 9.9% |
| Period 1 of 2026-27 | 1,327 | 65.9% | 7.4% |
| Period 13 of 2025-26 | 1,518 | 67.1% | 6.8% |
| Period 12 of 2025-26 | 1,419 | 68.7% | 5.8% |
| Period 11 of 2025-26 | 1,416 | 64.1% | 6.6% |
| Period 10 of 2025-26 | 1,178 | 71.8% | 5.1% |
| Period 9 of 2025-26 | 1,358 | 74.4% | 7.7% |
| Period 8 of 2025-26 | 1,100 | 70.3% | 4.5% |