GTR at Kentish Town
How this operator is doing here
GTR had 63,130 scheduled stops at Kentish Town in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 83.3% of recorded arrivals came within three minutes and 6.8% of stops were cancelled.
GTR trains at Kentish Town also serve London St Pancras International (2.1 km south-east, 80.0% on time, 5.7% cancelled), London Kings Cross (2.3 km south-east, 79.9% on time, 6.9% cancelled), Drayton Park (2.3 km east, 90.6% on time, 4.6% cancelled), Highbury and Islington (2.5 km east, 90.2% on time, 5.0% cancelled), Finsbury Park (2.8 km north-east, 82.2% on time, 5.3% cancelled) and Essex Road (3.1 km east, 91.8% on time, 4.9% cancelled), which are the stations on its network closest to Kentish Town.
Within 30 km of here, GTR runs best at Birkbeck, 17.2 km south (98.1%), and worst at Kenley, 25.2 km south (66.9%).
The busiest GTR station within 30 km of Kentish Town is East Croydon, 19.7 km south, with about 813 scheduled stops a day.
Of the 1 operators with enough records at Kentish Town, GTR is the most punctual, at 83.3%.
For GTR, Kentish Town ranks 160th of 307 stations and is typical: 83.3% here against 82.9% across the network, a difference of 0.4 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,023 | 82.1% | 5.4% |
| Period 6 of 2026-27 | 4,910 | 78.1% | 7.8% |
| Period 5 of 2026-27 | 4,908 | 79.9% | 9.2% |
| Period 4 of 2026-27 | 4,964 | 81.7% | 4.5% |
| Period 3 of 2026-27 | 4,014 | 81.1% | 6.7% |
| Period 2 of 2026-27 | 4,688 | 85.7% | 5.1% |
| Period 1 of 2026-27 | 5,410 | 86.1% | 5.2% |
| Period 13 of 2025-26 | 5,406 | 87.4% | 5.7% |
| Period 12 of 2025-26 | 5,110 | 85.9% | 5.3% |
| Period 11 of 2025-26 | 5,049 | 82.0% | 7.0% |
| Period 10 of 2025-26 | 3,883 | 83.4% | 10.8% |
| Period 9 of 2025-26 | 4,915 | 83.0% | 11.6% |
| Period 8 of 2025-26 | 4,850 | 84.6% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kentish Town
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out