GTR at Kensington Olympia
How this operator is doing here
GTR had 12,852 scheduled stops at Kensington Olympia in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 88.4% of recorded arrivals came within three minutes and 4.2% of stops were cancelled.
GTR trains at Kensington Olympia also serve Shepherd's Bush (1.1 km north-west, 88.0% on time, 5.3% cancelled), West Brompton (1.5 km south-east, 89.5% on time, 4.1% cancelled), Imperial Wharf (3.1 km south-east, 89.6% on time, 4.0% cancelled), London Victoria (4.5 km east, 83.0% on time, 3.1% cancelled), Clapham Junction (4.6 km south-east, 84.2% on time, 2.8% cancelled) and Battersea Park (4.8 km south-east, 94.1% on time, 2.8% cancelled), which are the stations on its network closest to Kensington Olympia.
Within 30 km of here, GTR runs best at Birkbeck, 14.9 km south-east (98.1%), and worst at Kenley, 20.6 km south (66.9%).
The busiest GTR station within 30 km of Kensington Olympia is East Croydon, 15.8 km south-east, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Kensington Olympia, GTR is the most punctual, at 88.4%.
For GTR, Kensington Olympia is the 84th best of 307 ranked stations. Its 88.4% here is 5.5 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,000 | 87.9% | 4.4% |
| Period 6 of 2026-27 | 1,037 | 86.5% | 0.8% |
| Period 5 of 2026-27 | 1,003 | 89.9% | 10.0% |
| Period 4 of 2026-27 | 1,041 | 87.7% | 5.3% |
| Period 3 of 2026-27 | 947 | 87.6% | 7.1% |
| Period 2 of 2026-27 | 969 | 85.5% | 6.0% |
| Period 1 of 2026-27 | 1,079 | 90.3% | 2.3% |
| Period 13 of 2025-26 | 1,152 | 92.1% | 2.5% |
| Period 12 of 2025-26 | 1,006 | 88.6% | 4.4% |
| Period 11 of 2025-26 | 832 | 86.7% | 1.8% |
| Period 10 of 2025-26 | 955 | 89.4% | 2.3% |
| Period 9 of 2025-26 | 972 | 89.1% | 2.4% |
| Period 8 of 2025-26 | 859 | 86.4% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kensington Olympia
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,441 | 86.7% | 11.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out