Elizabeth line at Ilford
How this operator is doing here
Elizabeth line had 118,886 scheduled stops at Ilford in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 90.1% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Elizabeth line trains at Ilford also serve Manor Park (1.8 km south-west, 89.5% on time, 2.5% cancelled), Seven Kings (2.0 km east, 88.3% on time, 2.5% cancelled), Goodmayes (3.1 km east, 88.6% on time, 2.5% cancelled), Forest Gate (3.3 km west, 89.8% on time, 2.4% cancelled), Chadwell Heath (4.2 km east, 88.3% on time, 2.5% cancelled) and Maryland (4.6 km west, 89.8% on time, 2.4% cancelled), which are the stations on its network closest to Ilford.
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 8.4 km south-east (94.9%), and worst at Ealing Broadway, 26.0 km west (82.9%).
The busiest Elizabeth line station within 30 km of Ilford is London Paddington, 17.6 km west, with about 644 scheduled stops a day.
Of the 1 operators with enough records at Ilford, Elizabeth line is the most punctual, at 90.1%.
For Elizabeth line, Ilford ranks 13th of 41 stations and is typical: 90.1% here against 89.6% across the network, a difference of 0.5 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,281 | 91.8% | 1.8% |
| Period 6 of 2026-27 | 9,199 | 88.1% | 2.7% |
| Period 5 of 2026-27 | 9,284 | 86.0% | 4.8% |
| Period 4 of 2026-27 | 9,122 | 87.4% | 2.8% |
| Period 3 of 2026-27 | 9,226 | 87.6% | 3.0% |
| Period 2 of 2026-27 | 9,124 | 91.0% | 1.9% |
| Period 1 of 2026-27 | 10,549 | 91.7% | 1.9% |
| Period 13 of 2025-26 | 8,266 | 89.4% | 3.0% |
| Period 12 of 2025-26 | 9,282 | 93.7% | 0.8% |
| Period 11 of 2025-26 | 9,285 | 91.9% | 1.3% |
| Period 10 of 2025-26 | 8,232 | 93.2% | 1.5% |
| Period 9 of 2025-26 | 8,896 | 90.2% | 1.8% |
| Period 8 of 2025-26 | 9,140 | 89.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ilford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out