Hyde North
HYTNorth WestManaged by Northern Trains
How this station is performing
Hyde North had 12,558 scheduled stops to Period 7 of 2026-27, about 34 a day. 91.6% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
The nearest stations to Hyde North are Flowery Field (0.5 km south-east), Hyde Central (1.4 km south), Newton For Hyde (1.4 km south-east), Guide Bridge (2.1 km north-west) and Godley (2.4 km south-east). 39 stations lie within 10 km in all. At 91.6%, Hyde North is more punctual than every one of them; the best of the five, Hyde Central, manages 90.9%.
Hyde North is named after Hyde, a town, home to about 35,895 people, but the station stands 1.9 km from its centre.
Across the whole run of data, the weakest four-week period for Hyde North was Period 9 of 2023-24, at 75.1%, some time before the latest year. The strongest was Period 13 of 2025-26, at 95.9%, and the two are 20.8 percentage points apart. Cancellations peaked at 7.4% of scheduled stops in Period 8 of 2024-25, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Hyde North is the most punctual, at 91.6%. The comparison group includes Winsford (63.9%), Entwistle (66.9%) and Acton Bridge (Cheshire) (61.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,558 | 91.6% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 980 | 91.8% | 1.4% |
| Period 6 of 2026-27 | 980 | 92.8% | 2.1% |
| Period 5 of 2026-27 | 880 | 91.5% | 2.4% |
| Period 4 of 2026-27 | 960 | 90.7% | 1.3% |
| Period 3 of 2026-27 | 877 | 92.9% | 0.6% |
| Period 2 of 2026-27 | 980 | 94.1% | 2.3% |
| Period 1 of 2026-27 | 1,138 | 91.9% | 3.3% |
| Period 13 of 2025-26 | 1,062 | 95.9% | 0.9% |
| Period 12 of 2025-26 | 929 | 93.1% | 2.0% |
| Period 11 of 2025-26 | 980 | 93.0% | 0.8% |
| Period 10 of 2025-26 | 888 | 91.8% | 4.4% |
| Period 9 of 2025-26 | 949 | 82.4% | 4.0% |
| Period 8 of 2025-26 | 955 | 88.4% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Winsford | 12,558 | 63.9% | 4.4% |
| Entwistle | 12,577 | 66.9% | 2.9% |
| Acton Bridge (Cheshire) | 12,512 | 61.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out