Hyde Central
HYCNorth WestManaged by Northern Trains
How this station is performing
Hyde Central had 12,615 scheduled stops to Period 7 of 2026-27, about 35 a day. 90.9% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Hyde Central opened on 1 March 1858. It was moved to the site it uses now on 5 August 1862. Among the 5 stations nearest to it with a known opening date, Newton For Hyde is the oldest (1841) and Godley the newest (1986), with Hyde Central in between.
The nearest stations to Hyde Central are Flowery Field (1.1 km north), Newton For Hyde (1.3 km north-east), Hyde North (1.4 km north), Godley (2.0 km east) and Woodley (2.6 km south). 38 stations lie within 10 km in all. Of the five, Woodley is the most punctual at 92.3% and Godley the least at 87.3%, with Hyde Central on 90.9%.
Hyde Central is named after Hyde, a town, home to about 35,895 people, but the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Hyde Central was Period 9 of 2023-24, at 76.3%, some time before the latest year. The strongest was Period 13 of 2025-26, at 95.9%, and the two are 19.6 percentage points apart. Cancellations peaked at 7.6% of scheduled stops in Period 8 of 2024-25, against 2.1% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Hyde Central on 90.9%. The comparison group includes Woodley (92.3%), Dalston (Cumbria) (93.4%) and Church and Oswaldtwistle (81.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,615 | 90.9% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 980 | 91.8% | 1.4% |
| Period 6 of 2026-27 | 980 | 92.2% | 2.1% |
| Period 5 of 2026-27 | 880 | 91.3% | 2.4% |
| Period 4 of 2026-27 | 960 | 90.7% | 1.3% |
| Period 3 of 2026-27 | 877 | 92.5% | 0.6% |
| Period 2 of 2026-27 | 980 | 93.5% | 2.4% |
| Period 1 of 2026-27 | 1,138 | 92.2% | 3.3% |
| Period 13 of 2025-26 | 1,062 | 95.9% | 0.9% |
| Period 12 of 2025-26 | 931 | 90.8% | 2.0% |
| Period 11 of 2025-26 | 980 | 92.9% | 0.8% |
| Period 10 of 2025-26 | 894 | 90.9% | 4.5% |
| Period 9 of 2025-26 | 973 | 77.5% | 4.1% |
| Period 8 of 2025-26 | 980 | 88.9% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Woodley | 12,615 | 92.3% | 2.1% |
| Dalston (Cumbria) | 12,627 | 93.4% | 3.0% |
| Church and Oswaldtwistle | 12,635 | 81.4% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out