Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Huntingdon

All trains at HuntingdonLNER across BritainEast of England

On time, last 13 periods–Whole station: 79.9%
Cancelled–Whole station: 6.0%
Scheduled stops4Of 29,516 at the station

How this operator is doing here

There are not enough usable records of LNER at Huntingdon to report how punctual it is.

Period by period

75%80%85%90%2023-242024-252025-262026-27Period 12 of 2023-24: 84.1%
This pageGreat Britain
0%2%4%Period 12 of 2023-24: 0.0%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

Other operators at Huntingdon

OperatorScheduled stopsWithin 3 minCancelled
GTR29,51179.9%6.0%
Grand Central1––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out