Horden
HRENorth EastManaged by Northern Trains
How this station is performing
Horden had 13,029 scheduled stops to Period 7 of 2026-27, about 36 a day. 76.3% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Horden opened on 1 September 1905 and closed to passengers on 4 May 1964. It reopened on 29 June 2020, 6 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Horden is the newest; the oldest, Hartlepool, opened in 1841.
The nearest stations to Horden are Seaham (8.7 km north), Hartlepool (10.7 km south-east), Seaton Carew (13.6 km south-east), Sunderland (16.5 km north) and Billingham (17.7 km south). 1 stations lie within 10 km in all. Of the five, Seaton Carew is the most punctual at 77.6% and Hartlepool the least at 74.2%, with Horden on 76.3%.
Horden is one of 2 stations named after a Village called Horden, home to about 8,524 people; this one stands 0.5 km from its centre.
Horden improved sharply over the past year. In the latest 13 periods 76.3% of stops came within three minutes of the timetable, up 10.5 percentage points from 65.8% in the 13 before. Cancellations fell to 2.1% of scheduled stops from 3.4%, which is 1.3 percentage points fewer.
Compared with 3 stations of a similar size in North East, Horden is the least punctual, at 76.3%. All of them are ahead, including Nunthorpe (85.7%), Billingham (77.4%) and Seaton Carew (77.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,029 | 76.3% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,004 | 76.7% | 2.3% |
| Period 6 of 2026-27 | 1,004 | 80.9% | 2.6% |
| Period 5 of 2026-27 | 1,004 | 78.9% | 2.9% |
| Period 4 of 2026-27 | 932 | 79.9% | 2.3% |
| Period 3 of 2026-27 | 995 | 80.0% | 1.1% |
| Period 2 of 2026-27 | 1,003 | 82.2% | 2.3% |
| Period 1 of 2026-27 | 1,152 | 84.3% | 0.9% |
| Period 13 of 2025-26 | 1,107 | 81.5% | 1.8% |
| Period 12 of 2025-26 | 1,004 | 82.0% | 1.6% |
| Period 11 of 2025-26 | 1,003 | 79.5% | 2.6% |
| Period 10 of 2025-26 | 875 | 68.9% | 4.7% |
| Period 9 of 2025-26 | 976 | 56.5% | 1.2% |
| Period 8 of 2025-26 | 970 | 57.3% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Nunthorpe | 13,118 | 85.7% | 3.0% |
| Billingham | 12,879 | 77.4% | 2.1% |
| Seaton Carew | 12,879 | 77.6% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out