Northern at Hope (Derbyshire)
All trains at Hope (Derbyshire)Northern across BritainEast Midlands
How this operator is doing here
Northern had 11,376 scheduled stops at Hope (Derbyshire) in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 69.5% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Northern trains at Hope (Derbyshire) also serve Bamford (2.8 km east, 68.2% on time, 1.9% cancelled), Hathersage (5.6 km south-east, 69.7% on time, 1.9% cancelled), Edale (6.2 km west, 73.3% on time, 1.9% cancelled), Grindleford (8.2 km south-east, 71.8% on time, 2.0% cancelled), Dove Holes (11.8 km south-west, 89.2% on time, 2.1% cancelled) and Chapel-en-le-Frith (13.1 km west, 88.2% on time, 2.1% cancelled), which are the stations on its network closest to Hope (Derbyshire).
Within 30 km of here, Northern runs best at Rose Hill Marple, 23.7 km west (93.3%), and worst at Bamford, 2.8 km east (68.2%).
The busiest Northern station within 30 km of Hope (Derbyshire) is Sheffield, 18.1 km east, with about 320 scheduled stops a day.
Northern at Hope (Derbyshire) has slipped sharply. 69.5% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 74.6% recorded in the 13 before. Cancellations fell to 1.9% of scheduled stops from 3.3%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 876 | 67.1% | 1.1% |
| Period 6 of 2026-27 | 876 | 67.7% | 0.9% |
| Period 5 of 2026-27 | 880 | 60.3% | 3.0% |
| Period 4 of 2026-27 | 876 | 66.5% | 0.5% |
| Period 3 of 2026-27 | 875 | 60.8% | 0.7% |
| Period 2 of 2026-27 | 880 | 66.5% | 4.2% |
| Period 1 of 2026-27 | 1,004 | 75.1% | 2.9% |
| Period 13 of 2025-26 | 844 | 76.8% | 0.6% |
| Period 12 of 2025-26 | 880 | 76.7% | 0.3% |
| Period 11 of 2025-26 | 833 | 78.7% | 2.2% |
| Period 10 of 2025-26 | 796 | 70.5% | 3.4% |
| Period 9 of 2025-26 | 880 | 65.9% | 3.1% |
| Period 8 of 2025-26 | 876 | 70.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hope (Derbyshire)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 658 | 63.8% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out