Honley
HOYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Honley has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,785 scheduled stops, about 32 a day. In those periods 84.7% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Honley opened on 1 July 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Honley is the newest; the oldest, Huddersfield, opened in 1847.
The nearest stations to Honley are Brockholes (1.4 km south-east), Berry Brow (1.7 km north-west), Lockwood (3.2 km north-west), Stocksmoor (4.1 km east) and Huddersfield (4.5 km north). 12 stations lie within 10 km in all. Of the five, Lockwood is the most punctual at 85.6% and Huddersfield the least at 65.2%, with Honley on 84.7%.
Honley takes its name from a Village called Honley, home to about 5,897 people, and the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Honley was Period 2 of 2023-24, at 71.8%, some time before the latest year. The strongest was Period 7 of 2026-27, at 91.9%, and the two are 20.1 percentage points apart. Cancellations peaked at 12.5% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Honley is the most punctual, at 84.7%. The comparison group includes Berry Brow (81.9%), Brockholes (81.8%) and Denby Dale (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,785 | 84.7% | 1.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 831 | 91.9% | 1.7% |
| Period 6 of 2026-27 | 910 | 84.7% | 0.9% |
| Period 5 of 2026-27 | 905 | 88.2% | 1.5% |
| Period 4 of 2026-27 | 892 | 87.3% | 0.7% |
| Period 3 of 2026-27 | 909 | 86.3% | 2.0% |
| Period 2 of 2026-27 | 894 | – | 2.2% |
| Period 1 of 2026-27 | 1,024 | – | 2.4% |
| Period 13 of 2025-26 | 999 | 87.7% | 0.5% |
| Period 12 of 2025-26 | 901 | 83.8% | 0.9% |
| Period 11 of 2025-26 | 896 | 83.1% | 2.8% |
| Period 10 of 2025-26 | 826 | 83.1% | 2.4% |
| Period 9 of 2025-26 | 894 | 76.9% | 1.9% |
| Period 8 of 2025-26 | 904 | 79.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Berry Brow | 11,785 | 81.9% | 1.6% |
| Brockholes | 11,785 | 81.8% | 1.6% |
| Denby Dale | 11,785 | 75.2% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out