GTR at Hitchin
How this operator is doing here
GTR had 77,456 scheduled stops at Hitchin in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 77.3% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.
GTR trains at Hitchin also serve Letchworth Garden City (3.8 km north-east, 72.5% on time, 8.3% cancelled), Baldock (6.8 km north-east, 72.9% on time, 8.7% cancelled), Stevenage (6.8 km south-east, 80.7% on time, 6.1% cancelled), Arlesey (8.1 km north, 85.6% on time, 6.3% cancelled), Knebworth (10.9 km south-east, 77.5% on time, 5.7% cancelled) and Luton Airport Parkway (12.8 km south-west, 79.5% on time, 5.1% cancelled), which are the stations on its network closest to Hitchin.
Within 30 km of here, GTR runs best at Cuffley, 29.1 km south (92.1%), and worst at Foxton, 28.6 km north-east (66.8%).
The busiest GTR station within 30 km of Hitchin is St Albans City, 22.9 km south, with about 329 scheduled stops a day.
Of the 1 operators with enough records at Hitchin, GTR is the most punctual, at 77.3%.
For GTR, Hitchin is the 237th best of 307 ranked stations. Its 77.3% here is 5.6 percentage points below the 82.9% across the whole network.
Over three full railway years GTR at Hitchin has improved each time, from 75.6% within three minutes in 2023-24 to 77.2% in 2024-25 and 79.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,143 | 69.2% | 5.0% |
| Period 6 of 2026-27 | 5,948 | 67.0% | 10.6% |
| Period 5 of 2026-27 | 5,937 | 71.6% | 8.0% |
| Period 4 of 2026-27 | 5,955 | 71.2% | 11.9% |
| Period 3 of 2026-27 | 6,172 | 80.0% | 8.6% |
| Period 2 of 2026-27 | 6,124 | 82.7% | 7.5% |
| Period 1 of 2026-27 | 7,039 | 84.0% | 6.3% |
| Period 13 of 2025-26 | 6,572 | 83.9% | 2.4% |
| Period 12 of 2025-26 | 5,230 | 80.6% | 6.1% |
| Period 11 of 2025-26 | 5,683 | 80.4% | 3.7% |
| Period 10 of 2025-26 | 5,056 | 81.6% | 4.1% |
| Period 9 of 2025-26 | 5,614 | 74.2% | 9.7% |
| Period 8 of 2025-26 | 5,983 | 76.9% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hitchin
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grand Central | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out