Southeastern at Higham
How this operator is doing here
Southeastern had 1,689 scheduled stops at Higham in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 79.5% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Southeastern trains at Higham also serve Strood (Kent) (4.1 km south-east, 87.8% on time, 1.6% cancelled), Rochester (5.1 km south-east, 77.4% on time, 1.7% cancelled), Cuxton (5.9 km south, 94.1% on time, 1.6% cancelled), Chatham (6.4 km south-east, 77.2% on time, 1.8% cancelled), Gravesend (7.0 km west, 81.4% on time, 3.0% cancelled) and Gillingham (Kent) (7.4 km south-east, 77.4% on time, 1.4% cancelled), which are the stations on its network closest to Higham.
Within 30 km of here, Southeastern runs best at Yalding, 22.6 km south (95.3%), and worst at Teynham, 25.8 km south-east (67.8%).
The busiest Southeastern station within 30 km of Higham is Orpington, 26.8 km west, with about 344 scheduled stops a day.
Of the 2 operators with enough records at Higham, Southeastern is the least punctual, at 79.5%.
Southeastern at Higham has edged up: 79.5% of stops came within three minutes of the timetable in the latest 13 periods, 4.0 percentage points better than the 75.5% of the 13 before. Cancellations fell to 1.8% of scheduled stops from 3.6%, which is 1.8 percentage points fewer.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 170 | 83.0% | 2.9% |
| Period 6 of 2026-27 | 95 | 71.0% | 2.1% |
| Period 5 of 2026-27 | 55 | – | – |
| Period 4 of 2026-27 | 100 | 77.9% | 5.0% |
| Period 3 of 2026-27 | 100 | 69.4% | 2.0% |
| Period 2 of 2026-27 | 160 | 89.0% | 3.1% |
| Period 1 of 2026-27 | 108 | 82.1% | 0.9% |
| Period 13 of 2025-26 | 182 | 83.2% | 1.6% |
| Period 12 of 2025-26 | 160 | 81.9% | 0.0% |
| Period 11 of 2025-26 | 239 | 82.8% | 2.1% |
| Period 10 of 2025-26 | 50 | – | – |
| Period 9 of 2025-26 | 100 | 67.0% | 0.0% |
| Period 8 of 2025-26 | 170 | 74.0% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Higham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,056 | 84.5% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out