Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Hertford North

HFNEast of EnglandManaged by Govia Thameslink Railway (Great Northern)

On time, last 13 periods88.1%Great Britain: 83.6%
Cancelled4.6%Great Britain: 3.2%
Stops a day97Scheduled, on average
Punctuality rank733rd of 2,374Among ranked stations

How this station is performing

Hertford North had 35,246 scheduled stops to Period 7 of 2026-27, about 97 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.

Hertford North opened on 1 March 1858. It was moved to the site it uses now on 2 June 1924. Among the 5 stations nearest to it with a known opening date, Hertford East is the oldest (1843) and Watton-At-Stone the newest (1924), with Hertford North in between.

The nearest stations to Hertford North are Hertford East (1.4 km east), Ware (Herts) (4.5 km east), Bayford (4.5 km south), St Margarets (Herts) (6.5 km east) and Watton-At-Stone (6.7 km north). 11 stations lie within 10 km in all. At 88.1%, Hertford North is less punctual than all of them; the best of the five, Hertford East, manages 92.3%.

Hertford North is named after Hertford, a county town, home to about 29,418 people, but the station stands 1.1 km from its centre.

For Hertford North, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 57.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 96.1%, which is 38.6 percentage points higher. Cancellations peaked at 9.9% of scheduled stops in Period 7 of 2024-25, against 4.6% over the latest 13 periods.

2 of 3 stations of a similar size in East of England are more punctual than Hertford North on 88.1%. The comparison group includes Cuffley (92.1%), Bayford (89.7%) and Ashwell and Morden (72.8%).

Period by period

60%80%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.1%Period 2 of 2023-24: 93.4%Period 3 of 2023-24: 91.5%Period 4 of 2023-24: 95.0%Period 5 of 2023-24: 94.2%Period 6 of 2023-24: 92.1%Period 7 of 2023-24: 93.9%Period 8 of 2023-24: 89.7%Period 9 of 2023-24: 91.4%Period 10 of 2023-24: 91.9%Period 11 of 2023-24: 92.6%Period 12 of 2023-24: 77.5%Period 13 of 2023-24: 88.3%Period 1 of 2024-25: 93.8%Period 2 of 2024-25: 92.8%Period 3 of 2024-25: 91.7%Period 4 of 2024-25: 91.1%Period 5 of 2024-25: 92.3%Period 6 of 2024-25: 91.8%Period 7 of 2024-25: 89.1%Period 8 of 2024-25: 90.4%Period 9 of 2024-25: 88.2%Period 10 of 2024-25: 93.8%Period 11 of 2024-25: 91.5%Period 12 of 2024-25: 90.0%Period 13 of 2024-25: 92.1%Period 1 of 2025-26: 93.8%Period 2 of 2025-26: 92.4%Period 3 of 2025-26: 92.9%Period 4 of 2025-26: 92.9%Period 5 of 2025-26: 93.3%Period 6 of 2025-26: 94.1%Period 7 of 2025-26: 92.5%Period 8 of 2025-26: 92.4%Period 9 of 2025-26: 89.7%Period 10 of 2025-26: 92.4%Period 11 of 2025-26: 92.8%Period 12 of 2025-26: 91.9%Period 13 of 2025-26: 92.5%Period 1 of 2026-27: 93.6%Period 2 of 2026-27: 90.4%Period 3 of 2026-27: 91.7%Period 4 of 2026-27: 92.2%Period 5 of 2026-27: 77.8%Period 6 of 2026-27: 57.5%Period 7 of 2026-27: 86.8%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 2.7%Period 2 of 2023-24: 7.5%Period 3 of 2023-24: 4.1%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 2.7%Period 6 of 2023-24: 3.1%Period 7 of 2023-24: 3.0%Period 8 of 2023-24: 3.9%Period 9 of 2023-24: 2.9%Period 10 of 2023-24: 3.8%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 3.0%Period 1 of 2024-25: 4.4%Period 2 of 2024-25: 4.2%Period 3 of 2024-25: 4.9%Period 4 of 2024-25: 6.5%Period 5 of 2024-25: 4.9%Period 6 of 2024-25: 5.4%Period 7 of 2024-25: 9.9%Period 8 of 2024-25: 3.4%Period 9 of 2024-25: 4.4%Period 10 of 2024-25: 6.8%Period 11 of 2024-25: 1.5%Period 12 of 2024-25: 4.4%Period 13 of 2024-25: 2.9%Period 1 of 2025-26: 2.8%Period 2 of 2025-26: 2.1%Period 3 of 2025-26: 3.0%Period 4 of 2025-26: 2.6%Period 5 of 2025-26: 5.8%Period 6 of 2025-26: 3.9%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 2.6%Period 9 of 2025-26: 4.2%Period 10 of 2025-26: 2.4%Period 11 of 2025-26: 1.2%Period 12 of 2025-26: 1.9%Period 13 of 2025-26: 2.4%Period 1 of 2026-27: 3.6%Period 2 of 2026-27: 4.7%Period 3 of 2026-27: 7.0%Period 4 of 2026-27: 6.8%Period 5 of 2026-27: 8.2%Period 6 of 2026-27: 9.7%Period 7 of 2026-27: 5.1%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR35,24688.1%4.6%

Operators with their own page for this station are linked to it.

Late train at Hertford North? Delay Repay

These operators call at Hertford North and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,71486.8%5.1%
Period 6 of 2026-272,67257.5%9.7%
Period 5 of 2026-272,73577.8%8.2%
Period 4 of 2026-272,77292.2%6.8%
Period 3 of 2026-272,73291.7%7.0%
Period 2 of 2026-272,69690.4%4.7%
Period 1 of 2026-273,12093.6%3.6%
Period 13 of 2025-263,06492.5%2.4%
Period 12 of 2025-262,54491.9%1.9%
Period 11 of 2025-262,57692.8%1.2%
Period 10 of 2025-262,30192.4%2.4%
Period 9 of 2025-262,69889.7%4.2%
Period 8 of 2025-262,62292.4%2.6%

Time of year

80%90%100%P1: 94.3%1P2: 92.2%2P3: 92.0%3P4: 92.8%4P5: 89.2%5P6: 84.0%6P7: 90.5%7P8: 90.8%8P9: 89.7%9P10: 92.7%10P11: 92.3%11P12: 86.5%12P13: 91.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in East of England

StationScheduled stopsWithin 3 minCancelled
Cuffley35,23992.1%4.7%
Bayford33,81789.7%4.6%
Ashwell and Morden33,24472.8%9.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out