Hensall
HELYorkshire and The HumberManaged by Northern Trains
How this station is performing
Hensall had 945 scheduled stops to Period 7 of 2026-27, about 3 a day. 84.6% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Hensall opened on 1 April 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hensall is the newest; the oldest, Selby, opened in 1834.
The nearest stations to Hensall are Whitley Bridge (2.9 km west), Snaith (5.8 km east), Knottingley (9.6 km west), Selby (10.0 km north) and Rawcliffe (10.2 km east). 4 stations lie within 10 km in all. Of the five, Snaith is the most punctual at 87.0% and Selby the least at 73.8%, with Hensall on 84.6%.
Hensall takes its name from a Village called Hensall, home to about 852 people, and the station stands 0.8 km from its centre.
Hensall improved sharply over the past year. In the latest 13 periods 84.6% of stops came within three minutes of the timetable, up 5.1 percentage points from 79.5% in the 13 before. Cancellations fell to 1.9% of scheduled stops from 2.4%, which is 0.5 percentage points fewer.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Hensall on 84.6%. The comparison group includes Rawcliffe (84.4%), Snaith (87.0%) and Whitley Bridge (82.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 945 | 84.6% | 1.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 69 | 92.8% | 0.0% |
| Period 6 of 2026-27 | 72 | 92.9% | 2.8% |
| Period 5 of 2026-27 | 72 | 90.1% | 1.4% |
| Period 4 of 2026-27 | 72 | 89.7% | 5.6% |
| Period 3 of 2026-27 | 72 | 90.0% | 2.8% |
| Period 2 of 2026-27 | 72 | 91.7% | 0.0% |
| Period 1 of 2026-27 | 84 | 89.2% | 1.2% |
| Period 13 of 2025-26 | 78 | 85.9% | 0.0% |
| Period 12 of 2025-26 | 72 | 90.3% | 0.0% |
| Period 11 of 2025-26 | 72 | 73.6% | 0.0% |
| Period 10 of 2025-26 | 66 | 69.7% | 0.0% |
| Period 9 of 2025-26 | 72 | 63.1% | 9.7% |
| Period 8 of 2025-26 | 72 | 77.5% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rawcliffe | 945 | 84.4% | 1.9% |
| Snaith | 945 | 87.0% | 1.9% |
| Whitley Bridge | 945 | 82.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out