Henley-in-Arden
HNLWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Henley-in-Arden had 11,484 scheduled stops to Period 7 of 2026-27, about 32 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Henley-in-Arden opened on 6 June 1894. It was moved to the site it uses now on 1 July 1908. Among the 5 stations nearest to it with a known opening date, Lapworth is the oldest (1852) and Danzey the newest (1908), with Henley-in-Arden in between.
The nearest stations to Henley-in-Arden are Wootton Wawen (2.8 km south), Danzey (4.5 km north-west), Bearley (5.7 km south-east), Claverdon (6.2 km east) and Lapworth (6.9 km north-east). 11 stations lie within 10 km in all. Of the five, Bearley is the most punctual at 90.0% and Wootton Wawen the least at 84.2%, with Henley-in-Arden on 84.9%.
Henley-in-Arden takes its name from a town called Henley-in-Arden, home to about 3,000 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Henley-in-Arden was Period 9 of 2023-24, at 71.0%, some time before the latest year. The strongest was Period 5 of 2023-24, at 92.4%, and the two are 21.4 percentage points apart. Cancellations peaked at 13.3% of scheduled stops in Period 8 of 2023-24, against 3.6% over the latest 13 periods.
2 of 3 stations of a similar size in West Midlands are more punctual than Henley-in-Arden on 84.9%. The comparison group includes Earlswood (West Midlands) (85.8%), Wythall (87.4%) and The Lakes (Warks) (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 11,484 | 84.9% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Henley-in-Arden? Delay Repay
These operators call at Henley-in-Arden and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 900 | 81.8% | 1.9% |
| Period 6 of 2026-27 | 900 | 83.9% | 4.0% |
| Period 5 of 2026-27 | 712 | 82.1% | 7.2% |
| Period 4 of 2026-27 | 831 | 84.8% | 5.1% |
| Period 3 of 2026-27 | 898 | 86.2% | 5.0% |
| Period 2 of 2026-27 | 832 | 85.6% | 2.9% |
| Period 1 of 2026-27 | 1,036 | 88.8% | 3.2% |
| Period 13 of 2025-26 | 989 | 90.2% | 2.5% |
| Period 12 of 2025-26 | 900 | 91.1% | 3.2% |
| Period 11 of 2025-26 | 870 | 88.2% | 1.8% |
| Period 10 of 2025-26 | 816 | 81.8% | 4.4% |
| Period 9 of 2025-26 | 900 | 77.3% | 3.3% |
| Period 8 of 2025-26 | 900 | 80.6% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Earlswood (West Midlands) | 11,484 | 85.8% | 3.7% |
| Wythall | 11,484 | 87.4% | 3.7% |
| The Lakes (Warks) | 11,179 | 83.9% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out