Hengoed
HNGWalesManaged by TfW Rail
How this station is performing
Hengoed had 37,049 scheduled stops to Period 7 of 2026-27, about 102 a day. 90.1% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Hengoed opened on 31 March 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hengoed is the oldest; the next oldest, Ystrad Mynach, dates from 1858.
The nearest stations to Hengoed are Ystrad Mynach (1.3 km south-west), Pengam (2.6 km north), Gilfach Fargoed (4.1 km north), Llanbradach (4.8 km south) and Bargoed (5.1 km north). 20 stations lie within 10 km in all. Of the five, Bargoed is the most punctual at 91.3% and Gilfach Fargoed the least at 85.7%, with Hengoed on 90.1%.
Hengoed is one of 2 stations named after a Village called Hengoed, home to about 5,548 people; this one stands 0.5 km from its centre.
Hengoed improved sharply over the past year. In the latest 13 periods 90.1% of stops came within three minutes of the timetable, up 7.8 percentage points from 82.3% in the 13 before. Cancellations held steady at 4.7% of scheduled stops, against 5.0% before.
2 of 3 stations of a similar size in Wales are more punctual than Hengoed on 90.1%. The comparison group includes Pengam (87.9%), Bargoed (91.3%) and Aber (93.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 37,049 | 90.1% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Hengoed? Delay Repay
These operators call at Hengoed and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,942 | 90.4% | 3.1% |
| Period 6 of 2026-27 | 3,049 | 91.6% | 4.0% |
| Period 5 of 2026-27 | 2,834 | 90.5% | 5.9% |
| Period 4 of 2026-27 | 2,842 | 90.2% | 5.5% |
| Period 3 of 2026-27 | 2,934 | 93.1% | 3.1% |
| Period 2 of 2026-27 | 2,835 | 91.6% | 5.8% |
| Period 1 of 2026-27 | 3,449 | 93.8% | 4.8% |
| Period 13 of 2025-26 | 3,249 | 92.2% | 5.5% |
| Period 12 of 2025-26 | 2,239 | 93.8% | 2.4% |
| Period 11 of 2025-26 | 2,940 | 91.6% | 3.5% |
| Period 10 of 2025-26 | 2,601 | 85.2% | 5.0% |
| Period 9 of 2025-26 | 2,830 | 80.9% | 7.2% |
| Period 8 of 2025-26 | 2,305 | 83.4% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out