Northern at Hellifield
All trains at HellifieldNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 11,749 scheduled stops at Hellifield in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 78.2% of recorded arrivals came within three minutes and 0.9% of stops were cancelled.
Northern trains at Hellifield also serve Long Preston (2.0 km west, 80.4% on time, 0.9% cancelled), Settle (7.2 km north-west, 76.4% on time, 1.0% cancelled), Giggleswick (7.5 km north-west, 82.2% on time, 0.9% cancelled), Gargrave (8.7 km south-east, 79.1% on time, 0.9% cancelled), Skipton (14.4 km south-east, 89.7% on time, 1.1% cancelled) and Clapham (North Yorkshire) (15.9 km north-west, 82.0% on time, 0.9% cancelled), which are the stations on its network closest to Hellifield.
Within 30 km of here, Northern runs best at Ilkley, 28.2 km east (92.0%), and worst at Burnley Manchester Road, 25.1 km south (71.5%).
The busiest Northern station within 30 km of Hellifield is Skipton, 14.4 km south-east, with about 151 scheduled stops a day.
Of the 1 operators with enough records at Hellifield, Northern is the most punctual, at 78.2%.
For Northern, Hellifield ranks 278th of 493 stations and is typical: 78.2% here against 78.6% across the network, a difference of 0.4 percentage points.
Northern at Hellifield has not moved in one direction over three full railway years: 76.1% within three minutes in 2023-24, 74.0% in 2024-25 and 78.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 900 | 77.8% | 0.4% |
| Period 6 of 2026-27 | 900 | 79.6% | 0.2% |
| Period 5 of 2026-27 | 900 | 81.7% | 0.6% |
| Period 4 of 2026-27 | 900 | 78.4% | 1.1% |
| Period 3 of 2026-27 | 900 | 77.1% | 0.4% |
| Period 2 of 2026-27 | 900 | 77.1% | 1.6% |
| Period 1 of 2026-27 | 1,001 | 81.6% | 0.3% |
| Period 13 of 2025-26 | 988 | 85.0% | 1.0% |
| Period 12 of 2025-26 | 900 | 84.4% | 1.6% |
| Period 11 of 2025-26 | 900 | 83.7% | 1.2% |
| Period 10 of 2025-26 | 768 | 77.0% | 0.8% |
| Period 9 of 2025-26 | 900 | 69.3% | 1.9% |
| Period 8 of 2025-26 | 892 | 63.1% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hellifield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out