Hednesford
HNFWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Hednesford had 22,499 scheduled stops to Period 7 of 2026-27, about 62 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Hednesford opened on 7 November 1859 and closed to passengers on 18 January 1965. It reopened on 10 April 1989, 37 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Penkridge is the oldest (1837) and Landywood the newest (1908), with Hednesford in between.
The nearest stations to Hednesford are Cannock (3.0 km south-west), Landywood (6.0 km south), Rugeley Town (6.6 km north-east), Penkridge (8.1 km west) and Rugeley Trent Valley (8.2 km north-east). 6 stations lie within 10 km in all. Of the five, Rugeley Town is the most punctual at 94.3% and Penkridge the least at 57.1%, with Hednesford on 92.6%.
Hednesford takes its name from a town called Hednesford, home to about 18,702 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Hednesford was Period 9 of 2023-24, at 81.5%, some time before the latest year. The strongest was Period 1 of 2025-26, at 97.2%, and the two are 15.7 percentage points apart. Cancellations peaked at 9.0% of scheduled stops in Period 8 of 2023-24, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Hednesford is the most punctual, at 92.6%. The comparison group includes Lye (West Midlands) (88.3%), Old Hill (88.9%) and Langley Green (89.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 22,499 | 92.6% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Hednesford? Delay Repay
These operators call at Hednesford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,771 | 94.7% | 2.9% |
| Period 6 of 2026-27 | 1,767 | 93.9% | 1.9% |
| Period 5 of 2026-27 | 1,502 | 90.1% | 4.2% |
| Period 4 of 2026-27 | 1,455 | 82.7% | 4.6% |
| Period 3 of 2026-27 | 1,552 | 90.6% | 1.5% |
| Period 2 of 2026-27 | 1,643 | 90.3% | 4.3% |
| Period 1 of 2026-27 | 2,076 | 93.3% | 1.7% |
| Period 13 of 2025-26 | 1,960 | 95.1% | 1.3% |
| Period 12 of 2025-26 | 1,792 | 97.0% | 0.6% |
| Period 11 of 2025-26 | 1,766 | 95.0% | 6.3% |
| Period 10 of 2025-26 | 1,627 | 94.8% | 1.8% |
| Period 9 of 2025-26 | 1,792 | 90.8% | 8.5% |
| Period 8 of 2025-26 | 1,796 | 92.6% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lye (West Midlands) | 22,582 | 88.3% | 3.6% |
| Old Hill | 22,582 | 88.9% | 3.7% |
| Langley Green | 22,591 | 89.0% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out