Elizabeth line at Heathrow Terminal 5 (Rail Station Only)
All trains at Heathrow Terminal 5 (Rail Station Only)Elizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 27,436 scheduled stops at Heathrow Terminal 5 (Rail Station Only) in the 13 periods to Period 7 of 2026-27, 33% of the station's total. 91.0% of recorded arrivals came within three minutes and 7.7% of stops were cancelled.
Elizabeth line trains at Heathrow Terminal 5 (Rail Station Only) also serve Heathrow Terminals 2 and 3 (Rail Station Only) (2.3 km east, 88.0% on time, 6.2% cancelled), Heathrow Terminal 4 (Rail Station Only) (3.2 km south-east, 91.1% on time, 5.2% cancelled), Iver (4.2 km north, 84.0% on time, 4.7% cancelled), West Drayton (4.3 km north, 84.9% on time, 4.1% cancelled), Langley (Berks) (5.4 km north-west, 84.7% on time, 4.1% cancelled) and Hayes and Harlington (5.8 km north-east, 85.5% on time, 4.8% cancelled), which are the stations on its network closest to Heathrow Terminal 5 (Rail Station Only).
Within 30 km of here, Elizabeth line runs best at London Liverpool Street, 28.6 km east (92.5%), and worst at Twyford, 26.0 km west (82.7%).
The busiest Elizabeth line station within 30 km of Heathrow Terminal 5 (Rail Station Only) is London Paddington, 22.1 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Heathrow Terminal 5 (Rail Station Only), Elizabeth line is the least punctual, at 91.0%.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,120 | 91.7% | 6.7% |
| Period 6 of 2026-27 | 2,037 | 91.0% | 7.7% |
| Period 5 of 2026-27 | 2,120 | 90.0% | 17.3% |
| Period 4 of 2026-27 | 2,090 | 92.0% | 5.5% |
| Period 3 of 2026-27 | 2,038 | 89.3% | 12.1% |
| Period 2 of 2026-27 | 2,096 | 91.1% | 7.5% |
| Period 1 of 2026-27 | 2,401 | 91.8% | 6.5% |
| Period 13 of 2025-26 | 2,307 | 91.6% | 4.6% |
| Period 12 of 2025-26 | 2,090 | 92.6% | 4.6% |
| Period 11 of 2025-26 | 2,121 | 93.3% | 10.0% |
| Period 10 of 2025-26 | 1,948 | 93.5% | 5.6% |
| Period 9 of 2025-26 | 1,955 | 87.1% | 5.6% |
| Period 8 of 2025-26 | 2,113 | 87.6% | 6.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Heathrow Terminal 5 (Rail Station Only)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Express | 54,504 | 91.3% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out