Elizabeth line at Heathrow Terminal 4 (Rail Station Only)
All trains at Heathrow Terminal 4 (Rail Station Only)Elizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 49,684 scheduled stops at Heathrow Terminal 4 (Rail Station Only) in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 91.1% of recorded arrivals came within three minutes and 5.2% of stops were cancelled.
Elizabeth line trains at Heathrow Terminal 4 (Rail Station Only) also serve Heathrow Terminals 2 and 3 (Rail Station Only) (1.5 km north, 88.0% on time, 6.2% cancelled), Heathrow Terminal 5 (Rail Station Only) (3.2 km north-west, 91.0% on time, 7.7% cancelled), Hayes and Harlington (5.2 km north, 85.5% on time, 4.8% cancelled), West Drayton (5.9 km north, 84.9% on time, 4.1% cancelled), Iver (6.9 km north-west, 84.0% on time, 4.7% cancelled) and Southall (7.1 km north-east, 86.5% on time, 3.9% cancelled), which are the stations on its network closest to Heathrow Terminal 4 (Rail Station Only).
Within 30 km of here, Elizabeth line runs best at London Liverpool Street, 26.1 km east (92.5%), and worst at Twyford, 29.0 km west (82.7%).
The busiest Elizabeth line station within 30 km of Heathrow Terminal 4 (Rail Station Only) is London Paddington, 19.7 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Heathrow Terminal 4 (Rail Station Only), Elizabeth line is the least punctual, at 91.1%.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,853 | 91.5% | 4.0% |
| Period 6 of 2026-27 | 3,499 | 91.1% | 4.5% |
| Period 5 of 2026-27 | 3,908 | 89.0% | 11.3% |
| Period 4 of 2026-27 | 3,876 | 92.8% | 2.8% |
| Period 3 of 2026-27 | 3,676 | 89.4% | 6.3% |
| Period 2 of 2026-27 | 3,877 | 91.4% | 5.3% |
| Period 1 of 2026-27 | 4,298 | 93.3% | 5.0% |
| Period 13 of 2025-26 | 4,154 | 92.6% | 2.7% |
| Period 12 of 2025-26 | 3,825 | 92.2% | 4.7% |
| Period 11 of 2025-26 | 3,808 | 91.7% | 6.8% |
| Period 10 of 2025-26 | 3,562 | 92.4% | 3.7% |
| Period 9 of 2025-26 | 3,592 | 87.5% | 5.2% |
| Period 8 of 2025-26 | 3,756 | 88.5% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Heathrow Terminal 4 (Rail Station Only)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Express | 218 | 96.0% | 7.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out