Northern at Hathersage
All trains at HathersageNorthern across BritainEast Midlands
How this operator is doing here
Northern had 11,376 scheduled stops at Hathersage in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 69.7% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Northern trains at Hathersage also serve Grindleford (2.8 km south-east, 71.8% on time, 2.0% cancelled), Bamford (2.9 km north-west, 68.2% on time, 1.9% cancelled), Hope (Derbyshire) (5.6 km north-west, 69.5% on time, 1.9% cancelled), Dore and Totley (9.1 km east, 72.2% on time, 2.0% cancelled), Edale (11.8 km west, 73.3% on time, 1.9% cancelled) and Dronfield (12.5 km east, 77.1% on time, 1.7% cancelled), which are the stations on its network closest to Hathersage.
Within 30 km of here, Northern runs best at Rose Hill Marple, 29.2 km west (93.3%), and worst at Bamford, 2.9 km north-west (68.2%).
The busiest Northern station within 30 km of Hathersage is Sheffield, 13.9 km north-east, with about 320 scheduled stops a day.
Of the 2 operators with enough records at Hathersage, Northern is the most punctual, at 69.7%.
Northern at Hathersage has slipped a little, from 73.2% within three minutes in the previous 13 periods to 69.7% in the latest 13, a fall of 3.5 percentage points. Cancellations fell to 1.9% of scheduled stops from 3.4%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 876 | 66.8% | 1.1% |
| Period 6 of 2026-27 | 876 | 67.7% | 0.9% |
| Period 5 of 2026-27 | 880 | 60.1% | 3.0% |
| Period 4 of 2026-27 | 876 | 67.2% | 0.5% |
| Period 3 of 2026-27 | 875 | 60.4% | 0.7% |
| Period 2 of 2026-27 | 880 | 69.0% | 4.1% |
| Period 1 of 2026-27 | 1,004 | 76.6% | 2.9% |
| Period 13 of 2025-26 | 844 | 78.1% | 0.6% |
| Period 12 of 2025-26 | 880 | 78.1% | 0.3% |
| Period 11 of 2025-26 | 833 | 79.5% | 2.2% |
| Period 10 of 2025-26 | 796 | 68.8% | 3.3% |
| Period 9 of 2025-26 | 880 | 65.6% | 3.2% |
| Period 8 of 2025-26 | 876 | 68.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hathersage
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 658 | 58.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out