East Midlands Railway at Hathersage
All trains at HathersageEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 658 scheduled stops at Hathersage in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 58.6% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
East Midlands Railway trains at Hathersage also serve Grindleford (2.8 km south-east, 63.8% on time, 3.3% cancelled), Bamford (2.9 km north-west, – on time, – cancelled), Hope (Derbyshire) (5.6 km north-west, 63.8% on time, 3.3% cancelled), Dore and Totley (9.1 km east, 45.9% on time, 3.8% cancelled), Edale (11.8 km west, 56.0% on time, 2.2% cancelled) and Dronfield (12.5 km east, 65.2% on time, 3.2% cancelled), which are the stations on its network closest to Hathersage.
Within 30 km of here, East Midlands Railway runs best at Matlock Bath, 23.5 km south (88.1%), and worst at Sheffield, 13.9 km north-east (57.7%).
The busiest East Midlands Railway station within 30 km of Hathersage is Chesterfield, 18.2 km south-east, with about 97 scheduled stops a day.
Of the 2 operators with enough records at Hathersage, East Midlands Railway is the least punctual, at 58.6%.
Cancellations of East Midlands Railway at Hathersage are near its usual level: 3.3% of scheduled stops, against 3.7% across its network and 1.9% for every operator at the station.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 52 | – | – |
| Period 6 of 2026-27 | 52 | – | – |
| Period 5 of 2026-27 | 45 | – | – |
| Period 4 of 2026-27 | 46 | – | – |
| Period 3 of 2026-27 | 52 | – | – |
| Period 2 of 2026-27 | 52 | – | – |
| Period 1 of 2026-27 | 60 | 58.6% | 3.3% |
| Period 13 of 2025-26 | 50 | – | – |
| Period 12 of 2025-26 | 50 | – | – |
| Period 11 of 2025-26 | 49 | – | – |
| Period 10 of 2025-26 | 47 | – | – |
| Period 9 of 2025-26 | 51 | – | – |
| Period 8 of 2025-26 | 52 | – | – |
Other operators at Hathersage
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,376 | 69.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out