Harringay
HGYLondonManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Harringay had 61,904 scheduled stops to Period 7 of 2026-27, about 170 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Harringay opened on 1 May 1885, 141 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Harringay is the newest; the oldest, Hornsey, opened in 1850.
The nearest stations to Harringay are Harringay Green Lanes (0.5 km east), Crouch Hill (1.1 km south-west), Hornsey (1.1 km north-west), Finsbury Park (1.4 km south) and Stamford Hill (2.0 km east). 110 stations lie within 10 km in all. Of the five, Crouch Hill is the most punctual at 94.6% and Finsbury Park the least at 82.2%, with Harringay on 89.9%.
Harringay takes its name from an area of London called Harringay, home to about 22,627 people, and the station stands 0.6 km from its centre.
For Harringay, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 75.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.8%, which is 19.4 percentage points higher.
2 of 3 stations of a similar size in London are more punctual than Harringay on 89.9%. The comparison group includes Hornsey (90.4%), Wandsworth Common (93.0%) and Wembley Central (89.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 61,904 | 89.9% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Harringay? Delay Repay
These operators call at Harringay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,688 | 86.5% | 5.0% |
| Period 6 of 2026-27 | 4,787 | 75.4% | 8.3% |
| Period 5 of 2026-27 | 4,853 | 89.6% | 6.5% |
| Period 4 of 2026-27 | 4,695 | 89.8% | 5.3% |
| Period 3 of 2026-27 | 4,783 | 91.7% | 6.0% |
| Period 2 of 2026-27 | 4,782 | 91.6% | 4.5% |
| Period 1 of 2026-27 | 5,355 | 92.6% | 3.3% |
| Period 13 of 2025-26 | 5,357 | 92.3% | 2.3% |
| Period 12 of 2025-26 | 4,328 | 93.2% | 1.8% |
| Period 11 of 2025-26 | 4,533 | 92.3% | 1.9% |
| Period 10 of 2025-26 | 4,202 | 93.2% | 2.6% |
| Period 9 of 2025-26 | 4,743 | 88.3% | 4.2% |
| Period 8 of 2025-26 | 4,798 | 91.3% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hornsey | 61,926 | 90.4% | 4.2% |
| Wandsworth Common | 61,691 | 93.0% | 2.8% |
| Wembley Central | 61,524 | 89.6% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out