Hanborough
HNDSouth EastManaged by Great Western Railway
How this station is performing
Hanborough has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,121 scheduled stops, about 39 a day. In those periods 60.5% of stops arrived within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Hanborough opened on 4 June 1853, 173 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Islip is the oldest (1850) and Oxford Parkway the newest (2015), with Hanborough in between.
The nearest stations to Hanborough are Combe (Oxon) (1.7 km north-west), Oxford Parkway (7.1 km east), Finstock (7.4 km north-west), Tackley (8.1 km north-east) and Islip (9.3 km east). 6 stations lie within 10 km in all. At 60.5%, Hanborough is less punctual than all of them; the best of the five, Islip, manages 92.5%.
Hanborough is named after Long Hanborough, a Village, home to about 2,630 people, but the station stands 1.4 km from its centre.
Hanborough has slipped sharply. 60.5% of stops came within three minutes of the timetable in the latest 13 periods, 10.1 percentage points worse than the 70.6% recorded in the 13 before. Cancellations held steady at 4.5% of scheduled stops, against 4.5% before.
Compared with 3 stations of a similar size in South East, Hanborough is the least punctual, at 60.5%. All of them are ahead, including Saunderton (89.2%), Aldermaston (79.5%) and Botley (70.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,121 | 60.5% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Hanborough? Delay Repay
These operators call at Hanborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,069 | 61.7% | 3.7% |
| Period 6 of 2026-27 | 1,084 | 55.1% | 5.5% |
| Period 5 of 2026-27 | 1,071 | 52.5% | 9.0% |
| Period 4 of 2026-27 | 1,073 | 54.4% | 6.2% |
| Period 3 of 2026-27 | 1,078 | 59.6% | 5.9% |
| Period 2 of 2026-27 | 1,072 | 63.7% | 3.2% |
| Period 1 of 2026-27 | 1,231 | 66.0% | 4.1% |
| Period 13 of 2025-26 | 1,196 | 76.2% | 2.3% |
| Period 12 of 2025-26 | 1,047 | – | 2.4% |
| Period 11 of 2025-26 | 1,076 | – | 2.5% |
| Period 10 of 2025-26 | 984 | 51.8% | 5.5% |
| Period 9 of 2025-26 | 1,074 | – | 3.5% |
| Period 8 of 2025-26 | 1,066 | – | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saunderton | 14,155 | 89.2% | 1.3% |
| Aldermaston | 14,215 | 79.5% | 1.7% |
| Botley | 14,010 | 70.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out