Hamstead (Birmingham)
HSDWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Hamstead (Birmingham) had 24,098 scheduled stops to Period 7 of 2026-27, about 66 a day. 90.5% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Hamstead (Birmingham) opened on 1 October 1862. It was moved to the site it uses now on 25 March 1899. Among the 5 stations nearest to it with a known opening date, Perry Barr is the oldest (1837) and Jewellery Quarter the newest (1995), with Hamstead (Birmingham) in between.
The nearest stations to Hamstead (Birmingham) are Perry Barr (2.4 km south-east), Witton (West Midlands) (3.6 km south-east), The Hawthorns (3.7 km south-west), Tame Bridge Parkway (4.0 km north-west) and Jewellery Quarter (4.7 km south). 35 stations lie within 10 km in all. Of the five, Perry Barr is the most punctual at 91.2% and Jewellery Quarter the least at 87.1%, with Hamstead (Birmingham) on 90.5%.
Hamstead (Birmingham) is named after Hamstead, a neighborhood, but the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Hamstead (Birmingham) was Period 9 of 2024-25, at 80.1%, some time before the latest year. The strongest was Period 1 of 2025-26, at 94.7%, and the two are 14.6 percentage points apart. Cancellations peaked at 7.4% of scheduled stops in Period 7 of 2024-25, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Hamstead (Birmingham) is the most punctual, at 90.5%. The comparison group includes Witton (West Midlands) (90.5%), Tipton (77.5%) and Bescot Stadium (90.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 24,098 | 90.5% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Hamstead (Birmingham)? Delay Repay
These operators call at Hamstead (Birmingham) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,842 | 89.0% | 2.1% |
| Period 6 of 2026-27 | 1,841 | 90.2% | 1.6% |
| Period 5 of 2026-27 | 1,800 | 90.9% | 3.6% |
| Period 4 of 2026-27 | 1,772 | 83.3% | 5.1% |
| Period 3 of 2026-27 | 1,673 | 91.1% | 1.9% |
| Period 2 of 2026-27 | 1,782 | 90.5% | 1.4% |
| Period 1 of 2026-27 | 2,163 | 92.3% | 1.8% |
| Period 13 of 2025-26 | 2,047 | 92.5% | 1.9% |
| Period 12 of 2025-26 | 1,872 | 93.7% | 0.5% |
| Period 11 of 2025-26 | 1,865 | 93.7% | 6.3% |
| Period 10 of 2025-26 | 1,697 | 92.3% | 1.2% |
| Period 9 of 2025-26 | 1,872 | 85.5% | 1.4% |
| Period 8 of 2025-26 | 1,872 | 90.5% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Witton (West Midlands) | 23,986 | 90.5% | 2.2% |
| Tipton | 23,906 | 77.5% | 2.8% |
| Bescot Stadium | 24,323 | 90.2% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out