Hampton Court
HMCSouth EastManaged by South Western Railway
How this station is performing
Hampton Court had 26,038 scheduled stops to Period 7 of 2026-27, about 72 a day. 86.3% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Hampton Court opened on 1 February 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Esher is the oldest (1838) and Hampton (London) the newest (1864), with Hampton Court in between.
The nearest stations to Hampton Court are Thames Ditton (1.5 km south), Hampton Wick (2.5 km north-east), Esher (2.5 km south), Teddington (2.6 km north) and Hampton (London) (2.6 km north-west). 54 stations lie within 10 km in all. Of the five, Thames Ditton is the most punctual at 88.5% and Esher the least at 80.1%, with Hampton Court on 86.3%.
Hampton Court is named after Hampton, an area of London, home to about 20,000 people, but the station stands 2.8 km from its centre.
Across the whole run of data, the weakest four-week period for Hampton Court was Period 9 of 2024-25, at 70.8%, some time before the latest year. The strongest was Period 5 of 2023-24, at 94.8%, and the two are 24.0 percentage points apart. Cancellations peaked at 6.7% of scheduled stops in Period 2 of 2026-27, against 3.1% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Hampton Court on 86.3%. The comparison group includes Eynsford (89.8%), Shoreham (Kent) (91.3%) and Meopham (79.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 26,038 | 86.3% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Hampton Court? Delay Repay
These operators call at Hampton Court and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,943 | 90.0% | 2.4% |
| Period 6 of 2026-27 | 2,075 | 91.2% | 1.8% |
| Period 5 of 2026-27 | 2,083 | 90.0% | 3.6% |
| Period 4 of 2026-27 | 1,977 | 90.8% | 1.7% |
| Period 3 of 2026-27 | 1,721 | 88.8% | 4.9% |
| Period 2 of 2026-27 | 1,905 | 81.2% | 6.7% |
| Period 1 of 2026-27 | 2,269 | 88.9% | 2.6% |
| Period 13 of 2025-26 | 1,941 | 90.1% | 1.1% |
| Period 12 of 2025-26 | 2,326 | 82.7% | 4.8% |
| Period 11 of 2025-26 | 1,976 | 86.6% | 0.8% |
| Period 10 of 2025-26 | 1,814 | 85.1% | 3.4% |
| Period 9 of 2025-26 | 1,887 | 74.3% | 1.6% |
| Period 8 of 2025-26 | 2,121 | 81.0% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eynsford | 26,033 | 89.8% | 3.1% |
| Shoreham (Kent) | 26,033 | 91.3% | 3.1% |
| Meopham | 26,096 | 79.4% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out