Haltwhistle
HWHNorth EastManaged by Northern Trains
How this station is performing
Haltwhistle had 19,796 scheduled stops to Period 7 of 2026-27, about 54 a day. 79.8% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Haltwhistle opened on 18 June 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Haltwhistle is the newest; the oldest, Hexham, opened in 1835.
The nearest stations to Haltwhistle are Bardon Mill (7.5 km east), Haydon Bridge (13.8 km east), Brampton (Cumbria) (15.9 km west), Hexham (23.5 km east) and Wetheral (25.4 km west). 1 stations lie within 10 km in all. Of the five, Hexham is the most punctual at 84.2% and Haydon Bridge the least at 77.5%, with Haltwhistle on 79.8%.
Haltwhistle takes its name from a town called Haltwhistle, home to about 3,811 people, and the station stands 0.4 km from its centre.
For Haltwhistle, the weakest four-week period in the data is a recent one: Period 10 of 2025-26, when only 59.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 89.8%, which is 30.8 percentage points higher. Cancellations peaked at 11.0% of scheduled stops in Period 7 of 2024-25, against 3.1% over the latest 13 periods.
1 of 3 stations of a similar size in North East are more punctual than Haltwhistle on 79.8%. The comparison group includes Alnmouth (65.8%), Stockton (76.4%) and Ashington (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 19,796 | 79.8% | 3.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,544 | 79.5% | 4.0% |
| Period 6 of 2026-27 | 1,544 | 85.4% | 3.2% |
| Period 5 of 2026-27 | 1,544 | 82.9% | 3.9% |
| Period 4 of 2026-27 | 1,544 | 81.9% | 3.4% |
| Period 3 of 2026-27 | 1,544 | 85.6% | 1.6% |
| Period 2 of 2026-27 | 1,524 | 81.1% | 3.0% |
| Period 1 of 2026-27 | 1,738 | 84.8% | 3.1% |
| Period 13 of 2025-26 | 1,645 | 81.8% | 2.9% |
| Period 12 of 2025-26 | 1,504 | 83.6% | 2.5% |
| Period 11 of 2025-26 | 1,451 | 81.8% | 4.9% |
| Period 10 of 2025-26 | 1,319 | 59.0% | 4.6% |
| Period 9 of 2025-26 | 1,448 | 67.7% | 1.7% |
| Period 8 of 2025-26 | 1,447 | 78.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out