TransPennine Express at Habrough
All trains at HabroughTransPennine Express across BritainYorkshire and The Humber
How this operator is doing here
TransPennine Express had 11,891 scheduled stops at Habrough in the 13 periods to Period 7 of 2026-27, 51% of the station's total. 68.5% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
TransPennine Express trains at Habrough also serve Barnetby (9.9 km west, 68.2% on time, 3.0% cancelled), Grimsby Town (12.9 km east, 77.5% on time, 2.8% cancelled), Hull (16.2 km north, 84.6% on time, 2.0% cancelled), Cleethorpes (16.5 km east, 79.0% on time, 2.9% cancelled), Brough (24.4 km north-west, 79.2% on time, 2.0% cancelled) and Scunthorpe (25.3 km west, 70.4% on time, 2.8% cancelled), which are the stations on its network closest to Habrough.
Within 30 km of here, TransPennine Express runs best at Hull, 16.2 km north (84.6%), and worst at Barnetby, 9.9 km west (68.2%).
The busiest TransPennine Express station within 30 km of Habrough is Hull, 16.2 km north, with about 36 scheduled stops a day.
Of the 2 operators with enough records at Habrough, TransPennine Express is the least punctual, at 68.5%.
For TransPennine Express, Habrough ranks 42nd of 77 stations and is typical: 68.5% here against 68.8% across the network, a difference of 0.3 percentage points.
TransPennine Express at Habrough has not moved in one direction over three full railway years: 65.0% within three minutes in 2023-24, 69.3% in 2024-25 and 67.8% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 917 | 70.8% | 1.6% |
| Period 6 of 2026-27 | 917 | 71.9% | 3.6% |
| Period 5 of 2026-27 | 913 | 64.8% | 6.5% |
| Period 4 of 2026-27 | 923 | 69.2% | 3.3% |
| Period 3 of 2026-27 | 922 | 66.6% | 2.6% |
| Period 2 of 2026-27 | 689 | 67.0% | 4.9% |
| Period 1 of 2026-27 | 1,055 | 70.1% | 2.7% |
| Period 13 of 2025-26 | 1,018 | 74.8% | 1.4% |
| Period 12 of 2025-26 | 924 | 73.1% | 2.3% |
| Period 11 of 2025-26 | 922 | 69.7% | 2.3% |
| Period 10 of 2025-26 | 843 | 66.3% | 3.6% |
| Period 9 of 2025-26 | 924 | 59.0% | 2.2% |
| Period 8 of 2025-26 | 924 | 64.9% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Habrough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 11,348 | 78.3% | 3.1% |
| Northern | 8 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out