How this operator is doing here
TransPennine Express had 11,890 scheduled stops at Grimsby Town in the 13 periods to Period 7 of 2026-27, 50% of the station's total. 77.5% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
TransPennine Express trains at Grimsby Town also serve Cleethorpes (3.7 km east, 79.0% on time, 2.9% cancelled), Habrough (12.9 km west, 68.5% on time, 3.1% cancelled), Barnetby (21.4 km west, 68.2% on time, 3.0% cancelled), Hull (26.4 km north-west, 84.6% on time, 2.0% cancelled), Brough (37.1 km north-west, 79.2% on time, 2.0% cancelled) and Scunthorpe (37.3 km west, 70.4% on time, 2.8% cancelled), which are the stations on its network closest to Grimsby Town.
Within 30 km of here, TransPennine Express runs best at Hull, 26.4 km north-west (84.6%), and worst at Barnetby, 21.4 km west (68.2%).
The busiest TransPennine Express station within 30 km of Grimsby Town is Hull, 26.4 km north-west, with about 36 scheduled stops a day.
Of the 2 operators with enough records at Grimsby Town, TransPennine Express is the least punctual, at 77.5%.
For TransPennine Express, Grimsby Town is the 11th best of 77 ranked stations. Its 77.5% here is 8.7 percentage points above the 68.8% across the whole network.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 917 | 79.9% | 1.6% |
| Period 6 of 2026-27 | 916 | 80.4% | 2.6% |
| Period 5 of 2026-27 | 913 | 74.6% | 5.9% |
| Period 4 of 2026-27 | 923 | 77.5% | 3.1% |
| Period 3 of 2026-27 | 922 | 75.5% | 2.2% |
| Period 2 of 2026-27 | 689 | 76.5% | 4.2% |
| Period 1 of 2026-27 | 1,055 | 81.5% | 2.7% |
| Period 13 of 2025-26 | 1,018 | 84.1% | 1.3% |
| Period 12 of 2025-26 | 924 | 83.1% | 2.3% |
| Period 11 of 2025-26 | 922 | 81.1% | 1.8% |
| Period 10 of 2025-26 | 843 | 74.6% | 3.3% |
| Period 9 of 2025-26 | 924 | 65.7% | 1.6% |
| Period 8 of 2025-26 | 924 | 71.3% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Grimsby Town
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 11,348 | 82.1% | 3.5% |
| Northern | 524 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out