Hale (Manchester)
HALNorth WestManaged by Northern Trains
How this station is performing
Hale (Manchester) has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,912 scheduled stops, about 36 a day. In those periods 81.6% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Hale (Manchester) opened on 12 May 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Altrincham is the oldest (1849) and Manchester Airport the newest (1993), with Hale (Manchester) in between.
The nearest stations to Hale (Manchester) are Altrincham (1.0 km north), Navigation Road (1.9 km north), Ashley (2.6 km south), Manchester Airport (5.2 km east) and Mobberley (5.5 km south). 19 stations lie within 10 km in all. Of the five, Altrincham is the most punctual at 82.2% and Manchester Airport the least at 72.4%, with Hale (Manchester) on 81.6%.
Hale (Manchester) is named after Hale, a Village, home to about 16,715 people, but the station stands 0.6 km from its centre.
Compared with 3 stations of a similar size in North West, Hale (Manchester) is the most punctual, at 81.6%. The comparison group includes Ashley (80.8%), Mobberley (78.7%) and Plumley (80.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,912 | 81.6% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 992 | 83.2% | 2.2% |
| Period 6 of 2026-27 | 1,000 | 83.2% | 1.9% |
| Period 5 of 2026-27 | 992 | 80.4% | 1.6% |
| Period 4 of 2026-27 | 992 | 78.5% | 1.7% |
| Period 3 of 2026-27 | 996 | 83.3% | 1.1% |
| Period 2 of 2026-27 | 988 | 81.2% | 1.0% |
| Period 1 of 2026-27 | 1,143 | – | 4.0% |
| Period 13 of 2025-26 | 1,086 | 89.6% | 1.1% |
| Period 12 of 2025-26 | 848 | 90.2% | 0.9% |
| Period 11 of 2025-26 | 989 | 78.4% | 2.6% |
| Period 10 of 2025-26 | 908 | 68.9% | 6.4% |
| Period 9 of 2025-26 | 990 | 77.9% | 3.8% |
| Period 8 of 2025-26 | 988 | 79.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out