Great Coates
GCTYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Great Coates had 5,425 scheduled stops to Period 7 of 2026-27, about 15 a day. 76.2% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Great Coates opened on 1 March 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Great Coates is the oldest; the next oldest, Grimsby Town, dates from 1848.
The nearest stations to Great Coates are Healing (2.1 km west), Grimsby Town (3.1 km south-east), Grimsby Docks (3.6 km east), Stallingborough (3.8 km west) and New Clee (4.6 km east). 7 stations lie within 10 km in all. At 76.2%, Great Coates is less punctual than all of them; the best of the five, Grimsby Town, manages 79.7%.
Great Coates takes its name from a Village called Great Coates, home to about 1,464 people, and the station stands 1.0 km from its centre.
Great Coates improved sharply over the past year. In the latest 13 periods 76.2% of stops came within three minutes of the timetable, up 6.8 percentage points from 69.4% in the 13 before. Cancellations held steady at 4.1% of scheduled stops, against 4.3% before.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Great Coates is the least punctual, at 76.2%. All of them are ahead, including Healing (78.4%), Grimsby Docks (79.2%) and New Clee (79.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,425 | 76.2% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Great Coates? Delay Repay
These operators call at Great Coates and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 389 | 82.5% | 1.5% |
| Period 6 of 2026-27 | 440 | 82.8% | 4.8% |
| Period 5 of 2026-27 | 440 | 65.8% | 8.9% |
| Period 4 of 2026-27 | 440 | 75.0% | 2.5% |
| Period 3 of 2026-27 | 440 | 73.6% | 4.3% |
| Period 2 of 2026-27 | 416 | 78.2% | 6.3% |
| Period 1 of 2026-27 | 476 | 82.9% | 3.2% |
| Period 13 of 2025-26 | 442 | 84.6% | 2.9% |
| Period 12 of 2025-26 | 408 | 79.5% | 2.0% |
| Period 11 of 2025-26 | 404 | 79.9% | 3.7% |
| Period 10 of 2025-26 | 362 | 75.4% | 6.6% |
| Period 9 of 2025-26 | 384 | 58.2% | 4.2% |
| Period 8 of 2025-26 | 384 | 68.4% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Healing | 5,425 | 78.4% | 4.1% |
| Grimsby Docks | 5,515 | 79.2% | 3.7% |
| New Clee | 5,515 | 79.1% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out