Gorton
GTONorth WestManaged by Northern Trains
How this station is performing
Gorton had 16,398 scheduled stops to Period 7 of 2026-27, about 45 a day. 87.5% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Gorton opened on 23 April 1842. It was moved to the site it uses now on 26 August 1906. Among the 5 stations nearest to it with a known opening date, Fairfield is the oldest (1841) and Ryder Brow the newest (1985), with Gorton in between.
The nearest stations to Gorton are Belle Vue (1.2 km south-west), Ryder Brow (1.4 km south), Fairfield (1.5 km east), Ashburys (1.9 km west) and Reddish North (2.2 km south). 40 stations lie within 10 km in all. Of the five, Ryder Brow is the most punctual at 92.5% and Reddish North the least at 85.3%, with Gorton on 87.5%.
Gorton is one of 3 stations named after a neighborhood called Gorton, home to about 36,055 people; this one stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Gorton was Period 9 of 2023-24, at 69.5%, some time before the latest year. The strongest was Period 12 of 2025-26, at 92.7%, and the two are 23.2 percentage points apart. Cancellations peaked at 7.7% of scheduled stops in Period 10 of 2024-25, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Gorton is the most punctual, at 87.5%. The comparison group includes Blackrod (56.3%), Adlington (Lancashire) (56.3%) and Greenfield (65.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 16,398 | 87.5% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,308 | 89.6% | 1.1% |
| Period 6 of 2026-27 | 1,304 | 88.3% | 2.1% |
| Period 5 of 2026-27 | 1,112 | 86.4% | 1.7% |
| Period 4 of 2026-27 | 1,276 | 85.8% | 2.0% |
| Period 3 of 2026-27 | 1,197 | 92.0% | 0.6% |
| Period 2 of 2026-27 | 1,295 | 90.0% | 2.3% |
| Period 1 of 2026-27 | 1,489 | 89.0% | 3.7% |
| Period 13 of 2025-26 | 1,432 | 89.8% | 1.0% |
| Period 12 of 2025-26 | 895 | 92.7% | 3.0% |
| Period 11 of 2025-26 | 1,293 | 91.6% | 0.8% |
| Period 10 of 2025-26 | 1,193 | 86.9% | 5.5% |
| Period 9 of 2025-26 | 1,296 | 75.2% | 3.7% |
| Period 8 of 2025-26 | 1,308 | 81.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blackrod | 16,337 | 56.3% | 5.0% |
| Adlington (Lancashire) | 16,285 | 56.3% | 5.1% |
| Greenfield | 16,282 | 65.9% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out