Goring and Streatley
GORSouth EastManaged by Great Western Railway
How this station is performing
Goring and Streatley had 23,904 scheduled stops to Period 7 of 2026-27, about 66 a day. 80.5% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Goring and Streatley opened on 1 June 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Goring and Streatley is the oldest; the next oldest, Pangbourne, dates from 1840.
The nearest stations to Goring and Streatley are Pangbourne (5.0 km south-east), Cholsey (5.7 km north), Tilehurst (9.1 km south-east), Theale (10.6 km south) and Reading West (12.3 km south-east). 3 stations lie within 10 km in all. Of the five, Tilehurst is the most punctual at 81.5% and Cholsey the least at 78.9%, with Goring and Streatley on 80.5%.
Goring and Streatley is named after Streatley, a Village, home to about 1,068 people, but the station stands 1.2 km from its centre.
Across the whole run of data, the weakest four-week period for Goring and Streatley was Period 9 of 2024-25, at 71.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 87.3%, and the two are 15.6 percentage points apart. Cancellations peaked at 6.6% of scheduled stops in Period 11 of 2023-24, against 2.4% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Goring and Streatley on 80.5%. The comparison group includes Cholsey (78.9%), Tilehurst (81.5%) and Aylesford (94.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 23,904 | 80.5% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Goring and Streatley? Delay Repay
These operators call at Goring and Streatley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,826 | 81.1% | 3.2% |
| Period 6 of 2026-27 | 1,586 | 77.6% | 3.7% |
| Period 5 of 2026-27 | 1,770 | 78.0% | 2.7% |
| Period 4 of 2026-27 | 1,647 | 74.9% | 2.9% |
| Period 3 of 2026-27 | 1,714 | 81.6% | 1.2% |
| Period 2 of 2026-27 | 1,829 | 82.3% | 2.1% |
| Period 1 of 2026-27 | 2,189 | 83.5% | 1.8% |
| Period 13 of 2025-26 | 2,073 | 83.4% | 1.8% |
| Period 12 of 2025-26 | 1,887 | 82.9% | 1.4% |
| Period 11 of 2025-26 | 1,884 | 83.9% | 3.0% |
| Period 10 of 2025-26 | 1,709 | 81.7% | 2.8% |
| Period 9 of 2025-26 | 1,896 | 76.4% | 2.2% |
| Period 8 of 2025-26 | 1,894 | 77.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out