How this station is performing
Cholsey had 23,904 scheduled stops to Period 7 of 2026-27, about 66 a day. 78.9% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Cholsey opened on 1 June 1840. It was moved to the site it uses now on 29 February 1892. Of the 5 stations nearest to it with a known opening date, Cholsey is the oldest; the next oldest, Goring and Streatley, dates from 1840.
The nearest stations to Cholsey are Goring and Streatley (5.7 km south), Didcot Parkway (7.4 km north-west), Appleford (9.6 km north-west), Pangbourne (10.6 km south-east) and Culham (10.7 km north-west). 3 stations lie within 10 km in all. Of the five, Pangbourne is the most punctual at 81.0% and Didcot Parkway the least at 70.8%, with Cholsey on 78.9%.
Cholsey takes its name from a Village called Cholsey, home to about 4,498 people, and the station stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Cholsey was Period 9 of 2024-25, at 69.1%, some time before the latest year. The strongest was Period 1 of 2023-24, at 87.0%, and the two are 17.9 percentage points apart. Cancellations peaked at 6.7% of scheduled stops in Period 11 of 2023-24, against 2.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Cholsey is the least punctual, at 78.9%. All of them are ahead, including Goring and Streatley (80.5%), Tilehurst (81.5%) and Aylesford (94.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 23,904 | 78.9% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Cholsey? Delay Repay
These operators call at Cholsey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,826 | 78.8% | 3.2% |
| Period 6 of 2026-27 | 1,586 | 75.9% | 3.6% |
| Period 5 of 2026-27 | 1,770 | 75.9% | 2.5% |
| Period 4 of 2026-27 | 1,647 | 73.9% | 2.9% |
| Period 3 of 2026-27 | 1,714 | 80.6% | 1.2% |
| Period 2 of 2026-27 | 1,829 | 80.8% | 2.1% |
| Period 1 of 2026-27 | 2,189 | 82.1% | 1.8% |
| Period 13 of 2025-26 | 2,073 | 81.7% | 1.8% |
| Period 12 of 2025-26 | 1,887 | 81.8% | 1.4% |
| Period 11 of 2025-26 | 1,884 | 82.2% | 3.0% |
| Period 10 of 2025-26 | 1,709 | 79.8% | 3.6% |
| Period 9 of 2025-26 | 1,896 | 74.9% | 2.2% |
| Period 8 of 2025-26 | 1,894 | 75.9% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Goring and Streatley | 23,904 | 80.5% | 2.4% |
| Tilehurst | 23,904 | 81.5% | 2.3% |
| Aylesford | 23,767 | 94.7% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out