Elizabeth line at Gidea Park
How this operator is doing here
Elizabeth line had 118,894 scheduled stops at Gidea Park in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 87.9% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
Elizabeth line trains at Gidea Park also serve Romford (1.8 km south-west, 88.8% on time, 2.3% cancelled), Harold Wood (2.4 km north-east, 88.1% on time, 3.3% cancelled), Chadwell Heath (5.5 km west, 88.3% on time, 2.5% cancelled), Goodmayes (6.7 km west, 88.6% on time, 2.5% cancelled), Brentwood (7.5 km north-east, 87.5% on time, 3.1% cancelled) and Seven Kings (7.8 km west, 88.3% on time, 2.5% cancelled), which are the stations on its network closest to Gidea Park.
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 11.7 km south-west (94.9%), and worst at Brentwood, 7.5 km north-east (87.5%).
The busiest Elizabeth line station within 30 km of Gidea Park is London Paddington, 27.4 km west, with about 644 scheduled stops a day.
Of the 1 operators with enough records at Gidea Park, Elizabeth line is the most punctual, at 87.9%.
For Elizabeth line, Gidea Park is the 25th best of 41 ranked stations. Its 87.9% here is 1.7 percentage points below the 89.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,282 | 90.9% | 2.1% |
| Period 6 of 2026-27 | 9,200 | 86.2% | 3.3% |
| Period 5 of 2026-27 | 9,284 | 84.6% | 5.6% |
| Period 4 of 2026-27 | 9,130 | 86.7% | 3.3% |
| Period 3 of 2026-27 | 9,226 | 86.5% | 3.8% |
| Period 2 of 2026-27 | 9,124 | 89.8% | 2.4% |
| Period 1 of 2026-27 | 10,549 | 89.6% | 2.2% |
| Period 13 of 2025-26 | 8,266 | 85.5% | 3.6% |
| Period 12 of 2025-26 | 9,282 | 91.0% | 0.9% |
| Period 11 of 2025-26 | 9,285 | 88.4% | 1.7% |
| Period 10 of 2025-26 | 8,230 | 90.9% | 1.9% |
| Period 9 of 2025-26 | 8,896 | 86.8% | 2.2% |
| Period 8 of 2025-26 | 9,140 | 85.9% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gidea Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 8 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out