TransPennine Express at Garforth
All trains at GarforthTransPennine Express across BritainYorkshire and The Humber
How this operator is doing here
TransPennine Express had 1,260 scheduled stops at Garforth in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 58.1% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
TransPennine Express trains at Garforth also serve East Garforth (0.8 km south-east, 93.6% on time, 0.0% cancelled), Micklefield (3.8 km east, 87.3% on time, 0.0% cancelled), Cross Gates (4.6 km west, 84.2% on time, 0.4% cancelled), Castleford (8.2 km south, 73.6% on time, 2.1% cancelled), South Milford (8.7 km east, – on time, – cancelled) and Church Fenton (10.7 km east, – on time, – cancelled), which are the stations on its network closest to Garforth.
Within 30 km of here, TransPennine Express runs best at York, 26.1 km north-east (75.7%), and worst at Brighouse, 28.3 km west (64.7%).
The busiest TransPennine Express station within 30 km of Garforth is York, 26.1 km north-east, with about 148 scheduled stops a day.
Of the 2 operators with enough records at Garforth, TransPennine Express is the least punctual, at 58.1%.
TransPennine Express at Garforth has slipped a little, from 61.7% within three minutes in the previous 13 periods to 58.1% in the latest 13, a fall of 3.6 percentage points. Cancellations held steady at 1.6% of scheduled stops, against 1.9% before.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 72 | 42.3% | 1.4% |
| Period 6 of 2026-27 | 182 | 79.0% | 0.5% |
| Period 5 of 2026-27 | 67 | 56.3% | 4.5% |
| Period 4 of 2026-27 | 77 | 58.0% | 7.8% |
| Period 3 of 2026-27 | 56 | 68.5% | 0.0% |
| Period 2 of 2026-27 | 129 | 55.8% | 0.0% |
| Period 1 of 2026-27 | 85 | 65.1% | 1.2% |
| Period 13 of 2025-26 | 79 | 66.2% | 3.8% |
| Period 12 of 2025-26 | 67 | 68.3% | 1.5% |
| Period 11 of 2025-26 | 40 | – | – |
| Period 10 of 2025-26 | 74 | 63.0% | 1.4% |
| Period 9 of 2025-26 | 173 | 34.7% | 1.2% |
| Period 8 of 2025-26 | 159 | 52.2% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Garforth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 32,293 | 68.1% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out