Northern at Gainsborough Lea Road
All trains at Gainsborough Lea RoadNorthern across BritainEast Midlands
How this operator is doing here
Northern had 11,674 scheduled stops at Gainsborough Lea Road in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 79.3% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Northern trains at Gainsborough Lea Road also serve Gainsborough Central (1.4 km north, – on time, – cancelled), Retford (14.2 km south-west, 80.3% on time, 2.2% cancelled), Saxilby (15.0 km south-east, 76.0% on time, 2.6% cancelled), Kirton Lindsey (16.0 km north-east, – on time, – cancelled), Althorpe (22.3 km north, 87.6% on time, 1.3% cancelled) and Crowle (22.9 km north, 87.2% on time, 1.3% cancelled), which are the stations on its network closest to Gainsborough Lea Road.
Within 30 km of here, Northern runs best at Scunthorpe, 23.6 km north (91.8%), and worst at Saxilby, 15.0 km south-east (76.0%).
The busiest Northern station within 30 km of Gainsborough Lea Road is Doncaster, 28.8 km north-west, with about 159 scheduled stops a day.
Northern at Gainsborough Lea Road has slipped sharply. 79.3% of stops came within three minutes of the timetable in the latest 13 periods, 8.6 percentage points worse than the 87.9% recorded in the 13 before. Cancellations fell to 2.5% of scheduled stops from 5.7%, which is 3.2 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 900 | 76.2% | 2.3% |
| Period 6 of 2026-27 | 900 | 77.9% | 2.1% |
| Period 5 of 2026-27 | 900 | 77.2% | 2.7% |
| Period 4 of 2026-27 | 900 | 80.4% | 5.3% |
| Period 3 of 2026-27 | 900 | 79.0% | 2.7% |
| Period 2 of 2026-27 | 900 | 78.2% | 2.6% |
| Period 1 of 2026-27 | 1,032 | 81.9% | 1.5% |
| Period 13 of 2025-26 | 993 | 82.0% | 1.3% |
| Period 12 of 2025-26 | 724 | 77.4% | 1.5% |
| Period 11 of 2025-26 | 900 | 78.7% | 2.0% |
| Period 10 of 2025-26 | 825 | 78.8% | 4.0% |
| Period 9 of 2025-26 | 900 | 79.2% | 2.4% |
| Period 8 of 2025-26 | 900 | 83.0% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gainsborough Lea Road
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 3,154 | 89.4% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out