East Midlands Railway at Gainsborough Lea Road
All trains at Gainsborough Lea RoadEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 3,154 scheduled stops at Gainsborough Lea Road in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 89.4% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.
East Midlands Railway trains at Gainsborough Lea Road also serve Saxilby (15.0 km south-east, 88.8% on time, 2.3% cancelled), Lincoln (23.4 km south-east, 88.4% on time, 1.8% cancelled), Hykeham (24.0 km south-east, 84.6% on time, 2.0% cancelled), Swinderby (24.5 km south, 88.3% on time, 2.1% cancelled), Worksop (24.9 km west, 86.5% on time, 3.6% cancelled) and Collingham (27.0 km south, 84.9% on time, 2.1% cancelled), which are the stations on its network closest to Gainsborough Lea Road.
Within 30 km of here, East Midlands Railway runs best at Saxilby, 15.0 km south-east (88.8%), and worst at Market Rasen, 28.7 km east (79.4%).
The busiest East Midlands Railway station within 30 km of Gainsborough Lea Road is Lincoln, 23.4 km south-east, with about 95 scheduled stops a day.
Of the 2 operators with enough records at Gainsborough Lea Road, East Midlands Railway is the most punctual, at 89.4%.
For East Midlands Railway, Gainsborough Lea Road is the 2nd best of 114 ranked stations. Its 89.4% here is 14.8 percentage points above the 74.6% across the whole network.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 240 | 87.0% | 0.8% |
| Period 6 of 2026-27 | 240 | 85.0% | 2.1% |
| Period 5 of 2026-27 | 240 | 90.0% | 4.2% |
| Period 4 of 2026-27 | 240 | 94.8% | 3.8% |
| Period 3 of 2026-27 | 236 | 91.3% | 1.7% |
| Period 2 of 2026-27 | 240 | 90.2% | 2.5% |
| Period 1 of 2026-27 | 280 | 93.9% | 0.4% |
| Period 13 of 2025-26 | 260 | 96.5% | 0.8% |
| Period 12 of 2025-26 | 240 | 92.9% | 0.0% |
| Period 11 of 2025-26 | 238 | 94.4% | 1.7% |
| Period 10 of 2025-26 | 220 | 89.2% | 2.7% |
| Period 9 of 2025-26 | 240 | 75.8% | 7.1% |
| Period 8 of 2025-26 | 240 | 79.5% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gainsborough Lea Road
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,674 | 79.3% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out