GTR at Finsbury Park
How this operator is doing here
GTR had 155,070 scheduled stops at Finsbury Park in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 82.2% of recorded arrivals came within three minutes and 5.3% of stops were cancelled.
GTR trains at Finsbury Park also serve Drayton Park (1.3 km south, 90.6% on time, 4.6% cancelled), Harringay (1.4 km north, 89.9% on time, 4.2% cancelled), Highbury and Islington (2.1 km south, 90.2% on time, 5.0% cancelled), Hornsey (2.4 km north, 90.4% on time, 4.2% cancelled), Essex Road (2.8 km south, 91.8% on time, 4.9% cancelled) and Kentish Town (2.8 km south-west, 83.3% on time, 6.8% cancelled), which are the stations on its network closest to Finsbury Park.
Within 30 km of here, GTR runs best at Beckenham Junction, 18.0 km south (98.1%), and worst at Kenley, 26.7 km south (66.9%).
The busiest GTR station within 30 km of Finsbury Park is East Croydon, 21.1 km south, with about 813 scheduled stops a day.
Of the 1 operators with enough records at Finsbury Park, GTR is the most punctual, at 82.2%.
For GTR, Finsbury Park is the 184th best of 307 ranked stations. Its 82.2% here is 0.7 percentage points below the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 12,046 | 76.2% | 4.2% |
| Period 6 of 2026-27 | 11,882 | 70.7% | 8.9% |
| Period 5 of 2026-27 | 11,855 | 79.7% | 6.8% |
| Period 4 of 2026-27 | 11,900 | 79.8% | 8.3% |
| Period 3 of 2026-27 | 11,955 | 84.7% | 6.9% |
| Period 2 of 2026-27 | 11,911 | 85.9% | 6.0% |
| Period 1 of 2026-27 | 13,701 | 87.9% | 4.6% |
| Period 13 of 2025-26 | 13,271 | 86.8% | 2.3% |
| Period 12 of 2025-26 | 11,125 | 85.8% | 3.5% |
| Period 11 of 2025-26 | 11,410 | 85.3% | 3.0% |
| Period 10 of 2025-26 | 10,060 | 85.3% | 3.2% |
| Period 9 of 2025-26 | 11,991 | 78.5% | 7.1% |
| Period 8 of 2025-26 | 11,963 | 81.2% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out