GTR at Farringdon
How this operator is doing here
GTR had 173,943 scheduled stops at Farringdon in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 79.6% of recorded arrivals came within three minutes and 5.9% of stops were cancelled.
GTR trains at Farringdon also serve City Thameslink (0.6 km south, 77.2% on time, 5.8% cancelled), London Blackfriars (1.0 km south, 80.4% on time, 5.4% cancelled), Moorgate (1.1 km east, 89.1% on time, 4.9% cancelled), Old Street (1.3 km north-east, 90.2% on time, 4.9% cancelled), London Kings Cross (1.9 km north-west, 79.9% on time, 6.9% cancelled) and London St Pancras International (2.1 km north-west, 80.0% on time, 5.7% cancelled), which are the stations on its network closest to Farringdon.
Within 30 km of here, GTR runs best at Beckenham Junction, 13.3 km south-east (98.1%), and worst at Kenley, 21.7 km south (66.9%).
The busiest GTR station within 30 km of Farringdon is East Croydon, 16.1 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Farringdon, GTR is the least punctual, at 79.6%.
For GTR, Farringdon is the 211th best of 307 ranked stations. Its 79.6% here is 3.3 percentage points below the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 14,202 | 74.7% | 3.5% |
| Period 6 of 2026-27 | 13,650 | 73.8% | 7.3% |
| Period 5 of 2026-27 | 13,290 | 74.6% | 7.9% |
| Period 4 of 2026-27 | 13,853 | 76.8% | 6.7% |
| Period 3 of 2026-27 | 10,945 | 78.1% | 5.6% |
| Period 2 of 2026-27 | 12,286 | 84.1% | 4.9% |
| Period 1 of 2026-27 | 15,430 | 86.5% | 4.7% |
| Period 13 of 2025-26 | 14,095 | 85.6% | 2.6% |
| Period 12 of 2025-26 | 14,026 | 83.5% | 6.0% |
| Period 11 of 2025-26 | 12,810 | 79.7% | 5.7% |
| Period 10 of 2025-26 | 11,354 | 81.9% | 7.2% |
| Period 9 of 2025-26 | 14,077 | 75.7% | 10.3% |
| Period 8 of 2025-26 | 13,925 | 78.7% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Farringdon
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 226,896 | 92.4% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out