GTR at Fareham
How this operator is doing here
GTR had 22,570 scheduled stops at Fareham in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 78.7% of recorded arrivals came within three minutes and 6.2% of stops were cancelled.
GTR trains at Fareham also serve Portchester (4.8 km east, 79.2% on time, 5.7% cancelled), Swanwick (5.7 km north-west, 77.7% on time, 7.4% cancelled), Portsmouth Harbour (8.6 km south-east, 77.2% on time, 15.5% cancelled), Cosham (8.9 km east, 75.5% on time, 5.7% cancelled), Portsmouth and Southsea (9.4 km south-east, 73.7% on time, 13.4% cancelled) and Hilsea (9.8 km east, 78.6% on time, 7.1% cancelled), which are the stations on its network closest to Fareham.
Within 30 km of here, GTR runs best at Woolston, 13.9 km west (84.5%), and worst at Bosham, 24.3 km east (71.6%).
The busiest GTR station within 30 km of Fareham is Chichester, 28.9 km east, with about 193 scheduled stops a day.
Of the 3 operators with enough records at Fareham, GTR is the most punctual, at 78.7%.
GTR at Fareham has slipped sharply. 78.7% of stops came within three minutes of the timetable in the latest 13 periods, 5.6 percentage points worse than the 84.3% recorded in the 13 before. Cancellations held steady at 6.2% of scheduled stops, against 6.1% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,748 | 70.0% | 5.4% |
| Period 6 of 2026-27 | 1,629 | 71.2% | 5.3% |
| Period 5 of 2026-27 | 1,776 | 72.7% | 2.9% |
| Period 4 of 2026-27 | 1,743 | 81.0% | 3.5% |
| Period 3 of 2026-27 | 1,640 | 80.8% | 7.9% |
| Period 2 of 2026-27 | 1,745 | 79.3% | 9.6% |
| Period 1 of 2026-27 | 1,991 | 80.6% | 5.5% |
| Period 13 of 2025-26 | 1,918 | 81.5% | 5.0% |
| Period 12 of 2025-26 | 1,579 | 81.3% | 6.3% |
| Period 11 of 2025-26 | 1,779 | 86.4% | 7.4% |
| Period 10 of 2025-26 | 1,522 | 83.3% | 9.0% |
| Period 9 of 2025-26 | 1,750 | 76.3% | 4.6% |
| Period 8 of 2025-26 | 1,750 | 79.7% | 8.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Fareham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 30,339 | 71.0% | 2.3% |
| Great Western Railway | 12,181 | 64.9% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out