Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Fareham

All trains at FarehamGTR across BritainSouth East

On time, last 13 periods78.7%Whole station: 72.5%
Cancelled6.2%Whole station: 4.0%
Scheduled stops22,570Of 65,090 at the station

How this operator is doing here

GTR had 22,570 scheduled stops at Fareham in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 78.7% of recorded arrivals came within three minutes and 6.2% of stops were cancelled.

GTR trains at Fareham also serve Portchester (4.8 km east, 79.2% on time, 5.7% cancelled), Swanwick (5.7 km north-west, 77.7% on time, 7.4% cancelled), Portsmouth Harbour (8.6 km south-east, 77.2% on time, 15.5% cancelled), Cosham (8.9 km east, 75.5% on time, 5.7% cancelled), Portsmouth and Southsea (9.4 km south-east, 73.7% on time, 13.4% cancelled) and Hilsea (9.8 km east, 78.6% on time, 7.1% cancelled), which are the stations on its network closest to Fareham.

Within 30 km of here, GTR runs best at Woolston, 13.9 km west (84.5%), and worst at Bosham, 24.3 km east (71.6%).

The busiest GTR station within 30 km of Fareham is Chichester, 28.9 km east, with about 193 scheduled stops a day.

Of the 3 operators with enough records at Fareham, GTR is the most punctual, at 78.7%.

GTR at Fareham has slipped sharply. 78.7% of stops came within three minutes of the timetable in the latest 13 periods, 5.6 percentage points worse than the 84.3% recorded in the 13 before. Cancellations held steady at 6.2% of scheduled stops, against 6.1% before.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 86.0%Period 2 of 2023-24: 79.9%Period 3 of 2023-24: 76.5%Period 4 of 2023-24: 72.9%Period 5 of 2023-24: 78.6%Period 6 of 2023-24: 80.4%Period 7 of 2023-24: 76.1%Period 8 of 2023-24: 64.3%Period 9 of 2023-24: 63.8%Period 10 of 2023-24: 74.2%Period 11 of 2023-24: 76.7%Period 12 of 2023-24: 80.4%Period 13 of 2023-24: 85.3%Period 1 of 2024-25: 80.2%Period 2 of 2024-25: 80.4%Period 3 of 2024-25: 83.4%Period 4 of 2024-25: 87.9%Period 5 of 2024-25: 84.6%Period 6 of 2024-25: 85.7%Period 7 of 2024-25: 83.1%Period 8 of 2024-25: 83.1%Period 9 of 2024-25: 71.4%Period 10 of 2024-25: 82.5%Period 11 of 2024-25: 84.9%Period 12 of 2024-25: 86.0%Period 13 of 2024-25: 86.8%Period 1 of 2025-26: 87.0%Period 2 of 2025-26: 87.1%Period 3 of 2025-26: 85.2%Period 4 of 2025-26: 83.2%Period 5 of 2025-26: 85.9%Period 6 of 2025-26: 86.4%Period 7 of 2025-26: 85.4%Period 8 of 2025-26: 79.7%Period 9 of 2025-26: 76.3%Period 10 of 2025-26: 83.3%Period 11 of 2025-26: 86.4%Period 12 of 2025-26: 81.3%Period 13 of 2025-26: 81.5%Period 1 of 2026-27: 80.6%Period 2 of 2026-27: 79.3%Period 3 of 2026-27: 80.8%Period 4 of 2026-27: 81.0%Period 5 of 2026-27: 72.7%Period 6 of 2026-27: 71.2%Period 7 of 2026-27: 70.0%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 4.3%Period 2 of 2023-24: 9.7%Period 3 of 2023-24: 7.1%Period 4 of 2023-24: 9.5%Period 5 of 2023-24: 3.4%Period 6 of 2023-24: 6.2%Period 7 of 2023-24: 6.0%Period 8 of 2023-24: 9.0%Period 9 of 2023-24: 8.7%Period 10 of 2023-24: 9.0%Period 11 of 2023-24: 5.9%Period 12 of 2023-24: 6.3%Period 13 of 2023-24: 3.3%Period 1 of 2024-25: 6.5%Period 2 of 2024-25: 6.9%Period 3 of 2024-25: 6.2%Period 4 of 2024-25: 3.9%Period 5 of 2024-25: 4.2%Period 6 of 2024-25: 2.6%Period 7 of 2024-25: 5.5%Period 8 of 2024-25: 4.8%Period 9 of 2024-25: 6.9%Period 10 of 2024-25: 7.2%Period 11 of 2024-25: 9.9%Period 12 of 2024-25: 4.5%Period 13 of 2024-25: 4.5%Period 1 of 2025-26: 5.4%Period 2 of 2025-26: 4.1%Period 3 of 2025-26: 7.5%Period 4 of 2025-26: 12.0%Period 5 of 2025-26: 4.7%Period 6 of 2025-26: 3.0%Period 7 of 2025-26: 4.8%Period 8 of 2025-26: 8.3%Period 9 of 2025-26: 4.6%Period 10 of 2025-26: 9.0%Period 11 of 2025-26: 7.4%Period 12 of 2025-26: 6.3%Period 13 of 2025-26: 5.0%Period 1 of 2026-27: 5.5%Period 2 of 2026-27: 9.6%Period 3 of 2026-27: 7.9%Period 4 of 2026-27: 3.5%Period 5 of 2026-27: 2.9%Period 6 of 2026-27: 5.3%Period 7 of 2026-27: 5.4%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,74870.0%5.4%
Period 6 of 2026-271,62971.2%5.3%
Period 5 of 2026-271,77672.7%2.9%
Period 4 of 2026-271,74381.0%3.5%
Period 3 of 2026-271,64080.8%7.9%
Period 2 of 2026-271,74579.3%9.6%
Period 1 of 2026-271,99180.6%5.5%
Period 13 of 2025-261,91881.5%5.0%
Period 12 of 2025-261,57981.3%6.3%
Period 11 of 2025-261,77986.4%7.4%
Period 10 of 2025-261,52283.3%9.0%
Period 9 of 2025-261,75076.3%4.6%
Period 8 of 2025-261,75079.7%8.3%

Time of year

70%80%90%P1: 83.2%1P2: 81.8%2P3: 81.7%3P4: 81.9%4P5: 80.5%5P6: 81.2%6P7: 78.7%7P8: 75.7%8P9: 71.3%9P10: 80.2%10P11: 82.9%11P12: 82.5%12P13: 84.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Fareham

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway30,33971.0%2.3%
Great Western Railway12,18164.9%4.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out