GTR at Eynsford
How this operator is doing here
GTR had 25,932 scheduled stops at Eynsford in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 89.8% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
GTR trains at Eynsford also serve Shoreham (Kent) (3.5 km south, 91.3% on time, 3.1% cancelled), Swanley (4.2 km north-west, 88.0% on time, 3.0% cancelled), Otford (5.5 km south, 91.3% on time, 3.1% cancelled), St Mary Cray (7.7 km north-west, 91.1% on time, 3.0% cancelled), Orpington (8.1 km west, 81.0% on time, 5.9% cancelled) and Bat and Ball (8.1 km south, 91.9% on time, 3.1% cancelled), which are the stations on its network closest to Eynsford.
Within 30 km of here, GTR runs best at Beckenham Junction, 16.9 km west (98.1%), and worst at Kenley, 21.6 km west (66.9%).
The busiest GTR station within 30 km of Eynsford is East Croydon, 20.7 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Eynsford, GTR is the least punctual, at 89.8%.
For GTR, Eynsford is the 63rd best of 307 ranked stations. Its 89.8% here is 6.9 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Eynsford are near its usual level: 3.1% of scheduled stops, against 4.7% across its network and 3.1% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,987 | 84.0% | 1.7% |
| Period 6 of 2026-27 | 1,889 | 81.8% | 4.2% |
| Period 5 of 2026-27 | 2,060 | 89.1% | 3.5% |
| Period 4 of 2026-27 | 2,056 | 89.9% | 3.6% |
| Period 3 of 2026-27 | 1,858 | 90.3% | 3.7% |
| Period 2 of 2026-27 | 1,915 | 91.9% | 3.5% |
| Period 1 of 2026-27 | 2,142 | 94.3% | 1.0% |
| Period 13 of 2025-26 | 2,173 | 92.4% | 3.0% |
| Period 12 of 2025-26 | 2,059 | 92.6% | 1.9% |
| Period 11 of 2025-26 | 2,020 | 92.5% | 2.1% |
| Period 10 of 2025-26 | 1,789 | 90.9% | 3.7% |
| Period 9 of 2025-26 | 1,930 | 86.8% | 4.6% |
| Period 8 of 2025-26 | 2,054 | 89.6% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Eynsford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 101 | 94.3% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out