Energlyn and Churchill Park
ECPWalesManaged by TfW Rail
How this station is performing
Energlyn and Churchill Park had 19,970 scheduled stops to Period 7 of 2026-27, about 55 a day. 91.4% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Energlyn and Churchill Park opened on 8 December 2013, 13 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Energlyn and Churchill Park is the newest; the oldest, Taffs Well, opened in 1840.
The nearest stations to Energlyn and Churchill Park are Aber (1.1 km south), Caerphilly (1.6 km south-east), Llanbradach (2.2 km north), Trefforest Estate (4.6 km south-west) and Taffs Well (5.4 km south-west). 25 stations lie within 10 km in all. Of the five, Caerphilly is the most punctual at 93.5% and Llanbradach the least at 91.2%, with Energlyn and Churchill Park on 91.4%.
Energlyn and Churchill Park is named after Energlyn, a suburb, but the station stands 0.6 km from its centre.
Energlyn and Churchill Park improved sharply over the past year. In the latest 13 periods 91.4% of stops came within three minutes of the timetable, up 8.2 percentage points from 83.2% in the 13 before. Cancellations fell to 4.4% of scheduled stops from 5.3%, which is 0.9 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Energlyn and Churchill Park is the most punctual, at 91.4%. The comparison group includes Bangor (Gwynedd) (76.5%), Crosskeys (86.9%) and Deganwy (89.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 19,970 | 91.4% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Energlyn and Churchill Park? Delay Repay
These operators call at Energlyn and Churchill Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,575 | 88.4% | 2.3% |
| Period 6 of 2026-27 | 1,681 | 91.1% | 4.2% |
| Period 5 of 2026-27 | 1,554 | 90.0% | 4.5% |
| Period 4 of 2026-27 | 1,562 | 89.6% | 4.8% |
| Period 3 of 2026-27 | 1,567 | 93.9% | 2.8% |
| Period 2 of 2026-27 | 1,517 | 92.3% | 5.7% |
| Period 1 of 2026-27 | 1,847 | 94.6% | 4.2% |
| Period 13 of 2025-26 | 1,767 | 94.0% | 4.8% |
| Period 12 of 2025-26 | 1,209 | 94.8% | 2.6% |
| Period 11 of 2025-26 | 1,578 | 93.8% | 3.5% |
| Period 10 of 2025-26 | 1,372 | 89.9% | 5.1% |
| Period 9 of 2025-26 | 1,519 | 84.0% | 7.4% |
| Period 8 of 2025-26 | 1,222 | 88.7% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bangor (Gwynedd) | 19,962 | 76.5% | 2.4% |
| Crosskeys | 20,016 | 86.9% | 3.9% |
| Deganwy | 20,016 | 89.0% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out