Emerson Park
EMPLondonManaged by London Overground
On time, last 13 periods–Great Britain: 83.6%
Cancelled0.4%Great Britain: 3.2%
Stops a day61Scheduled, on average
Punctuality rankNot rankedAmong ranked stations
How this station is performing
There are not enough usable punctuality records for Emerson Park in the 13 four-week periods to Period 7 of 2026-27 to say how punctual its trains are.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 22,220 | – | 0.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,720 | – | 0.0% |
| Period 6 of 2026-27 | 1,720 | – | 0.4% |
| Period 5 of 2026-27 | 1,720 | – | 0.3% |
| Period 4 of 2026-27 | 1,720 | – | 0.8% |
| Period 3 of 2026-27 | 1,720 | – | 0.1% |
| Period 2 of 2026-27 | 1,712 | – | 0.4% |
| Period 1 of 2026-27 | 1,976 | – | 0.1% |
| Period 13 of 2025-26 | 1,518 | – | 2.0% |
| Period 12 of 2025-26 | 1,720 | – | 0.0% |
| Period 11 of 2025-26 | 1,720 | – | 0.2% |
| Period 10 of 2025-26 | 1,582 | – | 0.4% |
| Period 9 of 2025-26 | 1,674 | – | 0.2% |
| Period 8 of 2025-26 | 1,718 | – | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out