Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Emerson Park

EMPLondonManaged by London Overground

On time, last 13 periods–Great Britain: 83.6%
Cancelled0.4%Great Britain: 3.2%
Stops a day61Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

There are not enough usable punctuality records for Emerson Park in the 13 four-week periods to Period 7 of 2026-27 to say how punctual its trains are.

Period by period

75%80%85%90%2023-242024-252025-262026-27
This pageGreat Britain
0%2%4%Period 1 of 2023-24: 0.3%Period 2 of 2023-24: 0.2%Period 3 of 2023-24: 0.3%Period 4 of 2023-24: 1.4%Period 5 of 2023-24: 0.2%Period 6 of 2023-24: 0.0%Period 7 of 2023-24: 0.0%Period 8 of 2023-24: 0.0%Period 9 of 2023-24: 0.6%Period 10 of 2023-24: 0.3%Period 11 of 2023-24: 0.2%Period 12 of 2023-24: 0.1%Period 13 of 2023-24: 0.3%Period 1 of 2024-25: 0.5%Period 2 of 2024-25: 0.7%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 0.0%Period 5 of 2024-25: 0.2%Period 6 of 2024-25: 0.0%Period 7 of 2024-25: 0.1%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 0.1%Period 10 of 2024-25: 1.0%Period 11 of 2024-25: 0.0%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 0.2%Period 1 of 2025-26: 0.0%Period 2 of 2025-26: 0.3%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.1%Period 5 of 2025-26: 1.2%Period 6 of 2025-26: 1.3%Period 7 of 2025-26: 0.5%Period 8 of 2025-26: 0.7%Period 9 of 2025-26: 0.2%Period 10 of 2025-26: 0.4%Period 11 of 2025-26: 0.2%Period 12 of 2025-26: 0.0%Period 13 of 2025-26: 2.0%Period 1 of 2026-27: 0.1%Period 2 of 2026-27: 0.4%Period 3 of 2026-27: 0.1%Period 4 of 2026-27: 0.8%Period 5 of 2026-27: 0.3%Period 6 of 2026-27: 0.4%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
London Overground22,220–0.4%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,720–0.0%
Period 6 of 2026-271,720–0.4%
Period 5 of 2026-271,720–0.3%
Period 4 of 2026-271,720–0.8%
Period 3 of 2026-271,720–0.1%
Period 2 of 2026-271,712–0.4%
Period 1 of 2026-271,976–0.1%
Period 13 of 2025-261,518–2.0%
Period 12 of 2025-261,720–0.0%
Period 11 of 2025-261,720–0.2%
Period 10 of 2025-261,582–0.4%
Period 9 of 2025-261,674–0.2%
Period 8 of 2025-261,718–0.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out